Exam 8: Supplier Quality Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Even when given the proper climate in which to work, most people do not want to do a good job.

Free
(True/False)
4.9/5
(74)
Correct Answer:
Verified

False

Because of the nature of many cost accounting systems, quality costs are rarely aggregated into various overhead accounts, which would mask their real impact on the finances and operations of a company.

Free
(True/False)
4.7/5
(83)
Correct Answer:
Verified

False

All delivery activities in a process can be considered wasteful.

Free
(True/False)
4.8/5
(80)
Correct Answer:
Verified

True

_____ are incurred following production or after the customer takes possession.

(Multiple Choice)
5.0/5
(79)

Which of the following is Falseconcerning Deming's philosophy on numerical quotas and measurement by objective?

(Multiple Choice)
4.9/5
(84)

Which of the following is not one of Deming's 14 points?

(Multiple Choice)
4.8/5
(79)

Deming indicates that the only proper way of dealing with defects is to inspect for and remove them from the process.

(True/False)
5.0/5
(81)

Designed-in systemic variation is a managerial concern, not a labor issue.

(True/False)
4.7/5
(75)

A _____ is designed to provide information about the performance of the process under stable operating conditions, i.e., when no special causes of variation are present.

(Multiple Choice)
4.9/5
(82)

The lowest purchase price of an item may be important in the short run for supply management but may cause increased costs somewhere else in the production system over the long run: excessive scrap and rework, defective products, greater warranty claims, and so on.

(True/False)
4.8/5
(77)

A grassroots TQM effort that emanates from the lower levels of the organization is doomed to failure without active and visible top management commitment and support.

(True/False)
4.9/5
(86)

In recent years, the concept of quality has changed radically from meeting customer requirements or expectations to exceeding them.

(True/False)
4.8/5
(88)

_____ represents the ability to meet or exceed current and future customer (i.e., buyer and eventually end customer) expectations or requirements within critical performance areas on a consistent basis.

(Multiple Choice)
4.8/5
(63)

A buyer cannot realistically expect the highest levels of supplier performance when the supplier must respond to frequent or short lead time changes.

(True/False)
4.8/5
(85)

It is far less expensive and more efficient in the long run to avoid generating the defect in the first place than it is to inspect for it once it is created.

(True/False)
4.8/5
(76)

To remain current registration, ISO 9001:2008 registration must be accomplished every _____.

(Multiple Choice)
4.9/5
(71)

In many respects, the cost of quality should actually be considered as the cost of "poor quality."

(True/False)
4.8/5
(77)

Which of the following is not one of the eight key principles of total quality management?

(Multiple Choice)
4.8/5
(79)

Which of the following is not one of the benefits to the buyer of a supplier achieving ISO 9001:2008 registration?

(Multiple Choice)
4.8/5
(54)

Once a firm fully rationalizes and optimizes its supply base, improvement will occur primarily by developing the capabilities of existing suppliers rather than by switching suppliers on a large scale.

(True/False)
4.9/5
(84)
Showing 1 - 20 of 94