Exam 10: Floor Framing
Exam 1: Hand Tools30 Questions
Exam 2: Hand Power Tools28 Questions
Exam 3: Stationary Power Tools28 Questions
Exam 4: Wood and Wood Products30 Questions
Exam 5: Fasteners30 Questions
Exam 6: Jobsite Safety and Construction Aids30 Questions
Exam 7: Building Plans and Codes30 Questions
Exam 8: Building Layout23 Questions
Exam 9: Concrete Form Construction29 Questions
Exam 10: Floor Framing30 Questions
Exam 11: Wall and Ceiling Framing30 Questions
Exam 12: Roof Framing30 Questions
Exam 13: Roofing30 Questions
Exam 14: Windows and Doors30 Questions
Exam 15: Siding and Decks30 Questions
Exam 16: Insulation and Ventilation28 Questions
Exam 17: Wall Finish29 Questions
Exam 18: Interior Finish30 Questions
Exam 19: Stair Construction30 Questions
Exam 20: Cabinets and Countertops30 Questions
Select questions type
Platform framing is done with long studs that rest on the foundation sill plate.
(True/False)
4.8/5
(75)
If joists are lapped over the girder, the minimum amount of lap is 3 inches and the maximum overhang is ____ inches.
(Multiple Choice)
4.9/5
(78)
You may cut or notch the flanges of wood I-beams wherever necessary.
(True/False)
4.8/5
(80)
Joists should rest on at least 1 1 / 2 inches of bearing on wood and 3 inches on ____.
(Multiple Choice)
4.7/5
(84)
If built-up girders of dimension lumber or engineered lumber are used, a minimum of ____ members are fastened together with three 3 1 / 2 inch or 16d nails at each end.
(Multiple Choice)
4.8/5
(80)
____ are heavy beams that support the inner ends of floor joists.
(Multiple Choice)
4.8/5
(94)
All the techniques used for the prevention of termite attack are based on keeping the wood in the structure ____ and making it as difficult as possible for termites to get to the wood.
(Multiple Choice)
4.9/5
(65)
Joists are generally spaced 16 inches OC (on center) in conventional framing.
(True/False)
4.9/5
(78)
Showing 21 - 30 of 30