Exam 10: Floor Framing

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Platform framing is done with long studs that rest on the foundation sill plate.

(True/False)
4.8/5
(75)

The post-and-beam frame uses large structural members.

(True/False)
4.9/5
(85)

If joists are lapped over the girder, the minimum amount of lap is 3 inches and the maximum overhang is ____ inches.

(Multiple Choice)
4.9/5
(78)

You may cut or notch the flanges of wood I-beams wherever necessary.

(True/False)
4.8/5
(80)

Joists should rest on at least 1 1 / 2 inches of bearing on wood and 3 inches on ____.

(Multiple Choice)
4.7/5
(84)

Joists lapped on top of a girder must be cut to length.

(True/False)
4.8/5
(84)

If built-up girders of dimension lumber or engineered lumber are used, a minimum of ____ members are fastened together with three 3 1 / 2 inch or 16d nails at each end.

(Multiple Choice)
4.8/5
(80)

____ are heavy beams that support the inner ends of floor joists.

(Multiple Choice)
4.8/5
(94)

All the techniques used for the prevention of termite attack are based on keeping the wood in the structure ____ and making it as difficult as possible for termites to get to the wood.

(Multiple Choice)
4.9/5
(65)

Joists are generally spaced 16 inches OC (on center) in conventional framing.

(True/False)
4.9/5
(78)
Showing 21 - 30 of 30
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)