Exam 12: Roof Framing
Exam 1: Hand Tools30 Questions
Exam 2: Hand Power Tools28 Questions
Exam 3: Stationary Power Tools28 Questions
Exam 4: Wood and Wood Products30 Questions
Exam 5: Fasteners30 Questions
Exam 6: Jobsite Safety and Construction Aids30 Questions
Exam 7: Building Plans and Codes30 Questions
Exam 8: Building Layout23 Questions
Exam 9: Concrete Form Construction29 Questions
Exam 10: Floor Framing30 Questions
Exam 11: Wall and Ceiling Framing30 Questions
Exam 12: Roof Framing30 Questions
Exam 13: Roofing30 Questions
Exam 14: Windows and Doors30 Questions
Exam 15: Siding and Decks30 Questions
Exam 16: Insulation and Ventilation28 Questions
Exam 17: Wall Finish29 Questions
Exam 18: Interior Finish30 Questions
Exam 19: Stair Construction30 Questions
Exam 20: Cabinets and Countertops30 Questions
Select questions type
If an overhang is specified at the rakes, horizontal structural members called ____ must be installed.
(Multiple Choice)
4.9/5
(82)
Step-off method for laying out rafters is the fastest and most accurate method.
(True/False)
4.9/5
(77)
____ rafters form the intersection of the slopes of two roofs.
(Multiple Choice)
4.8/5
(75)
Valley rafters are more similar than they are different to hip rafters..
(True/False)
5.0/5
(78)
Because the hip rafter run is at a ____-degree angle from the plates, the amount of horizontal distance it covers (total run) is greater than that of the common rafter.
(Multiple Choice)
4.9/5
(83)
To estimate the number of ____ needed in a roof construction, divide the width of the building by the OC (on center) spacing and add two.
(Multiple Choice)
4.9/5
(74)
The carpenter can at any time cut or remove the chords, braces, or webs of a truss system.
(True/False)
4.8/5
(86)
Showing 21 - 30 of 30
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)