Exam 12: Roof Framing

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

If an overhang is specified at the rakes, horizontal structural members called ____ must be installed.

(Multiple Choice)
4.9/5
(82)

Step-off method for laying out rafters is the fastest and most accurate method.

(True/False)
4.9/5
(77)

____ rafters form the intersection of the slopes of two roofs.

(Multiple Choice)
4.8/5
(75)

Valley rafters are more similar than they are different to hip rafters..

(True/False)
5.0/5
(78)

Because the hip rafter run is at a ____-degree angle from the plates, the amount of horizontal distance it covers (total run) is greater than that of the common rafter.

(Multiple Choice)
4.9/5
(83)

Wood I-beams may not be used for rafters.

(True/False)
4.9/5
(72)

The mansard roof is a combination of the gambrel and hip roofs.

(True/False)
4.8/5
(79)

Span of a building is the same as the run of the building.

(True/False)
4.9/5
(85)

To estimate the number of ____ needed in a roof construction, divide the width of the building by the OC (on center) spacing and add two.

(Multiple Choice)
4.9/5
(74)

The carpenter can at any time cut or remove the chords, braces, or webs of a truss system.

(True/False)
4.8/5
(86)