Most concrete used in construction is ____ concrete delivered to the job in a large truck.

(Multiple Choice)
4.9/5
(77)

To determine the number of cubic yards of concrete needed for a job, find the number of cubic feet and divide by ____.

(Multiple Choice)
4.9/5
(77)

____ are materials added to a concrete mix to achieve certain desired qualities.

(Multiple Choice)
4.9/5
(85)

____ is a mixture of Portland cement, fine and coarse aggregates, water, and various admixtures.

(Multiple Choice)
4.9/5
(87)

Rise is the vertical distance of a step, the height of each step.

(True/False)
4.9/5
(82)

Slump tests are done to determine the proper mixture of ingredients before placing concrete.

(True/False)
4.7/5
(59)

If concrete is moist-cured for 7 days, its strength is up to about ____ percent of full strength.

(Multiple Choice)
4.9/5
(79)

Form boards need to be accurately cut to length.

(True/False)
4.8/5
(87)

In tropical climates, footings must be placed as much as 6 feet below the surface.

(True/False)
4.9/5