Which of the following will cause an increase in ROI?

(Multiple Choice)
4.8/5
(73)

Of the following choices which contain both a traceable fixed cost and a common fixed cost?

(Multiple Choice)
4.8/5
(86)

Given below is an excerpt from a management performance report: Budget Actual Difference Contribution margin \ 1,000,000 \ 1,050,000 \ 50,000 Controllable fixed costs \ 500,000 \ 450,000 \ 50,000 The manager's overall performance

(Multiple Choice)
4.9/5
(84)

The primary basis for evaluating the performance of a manager of an investment center is _________________.

(Short Answer)
4.8/5
(85)

Le Sud Retailers has a current return on investment of 10% and the company has established an 8% minimum rate of return for the division. The division manager has two investment projects available for which the following estimates have been made: Project A - Annual controllable margin = $24000 operating assets = $400000 Project B - Annual controllable margin = $60000 operating assets = $550000 Which project should be funded?

(Multiple Choice)
4.8/5
(72)
Match the items below
The review of budget reports by top management directed entirely or primarily to differences between actual results and planned objectives.
Budgetary control
A part of management accounting that involves accumulating and reporting revenues and costs on the basis of the individual manager who has the authority to make the day-to-day decisions about the items.
Static budget
The preparation of reports for each level of responsibility shown in the company’s organization chart.
Flexible budget
Correct Answer:
Verified
Premises:
Responses:
The review of budget reports by top management directed entirely or primarily to differences between actual results and planned objectives.
Budgetary control
A part of management accounting that involves accumulating and reporting revenues and costs on the basis of the individual manager who has the authority to make the day-to-day decisions about the items.
Static budget
The preparation of reports for each level of responsibility shown in the company’s organization chart.
Flexible budget
A projection of budget data at one level of activity.
Responsibility accounting
Costs that a manager has the authority to incur within a given period of time.
Controllable costs
The use of budgets to control operations.
Management by exception
A projection of budget data for various levels of activity.
Responsibility reporting system
A responsibility center that incurs costs, generates revenues, and has control over the investment funds available for use.
Return on Investment
Costs that relate specifically to a responsibility center and are incurred for the sole benefit of the center.
Profit center
A responsibility center that incurs costs and also generates revenues.
Investment center
Costs which are incurred for the benefit of more than one profit center.
Indirect fixed costs
A measure of the profitability of an investment center computed by dividing controllable margin (in dollars) by average operating assets.
Direct fixed costs
(Matching)
4.9/5
(89)

Stone Industries uses flexible budgets. At normal capacity of 16000 units budgeted manufacturing overhead is: $48000 variable and $270000 fixed. If Stone had actual overhead costs of $321000 for 18000 units produced what is the difference between actual and budgeted costs?

(Multiple Choice)
4.8/5
(72)

Chambers Inc. uses flexible budgets. At normal capacity of 16000 units budgeted manufacturing overhead is: $64000 variable and $180000 fixed. If Chambers had actual overhead costs of $250000 for 18000 units produced what is the difference between actual and budgeted costs?

(Multiple Choice)
4.8/5
(82)

Lapp Manufacturing uses flexible budgets to control its selling expenses. Monthly sales are expected to be from $400000 to $480000. Variable costs and their percentage relationships to sales are: Sales commissions 6\% Advertising 4\% Traveling 5\% Delivery 1\% Fixed selling expenses consist of sales salaries $80000 and depreciation on delivery equipment $20000. Instructions Prepare a flexible budget for increments of $40000 of sales within the relevant range.

(Essay)
4.8/5
(74)

The data for an investment center is given below. The data for an investment center is given below.   The controllable margin is $440000. Instructions Compute the return on investment for the center for 2016. The controllable margin is $440000. Instructions Compute the return on investment for the center for 2016.

(Essay)
4.7/5
(76)

Cody Co. developed its annual manufacturing overhead budget for its master budget for 2016 as follows: Expected annual operating capacity 120,000 Direct Labor Hours Variable overhead costs Indirect labor \ 600,000 Indirect materials 120,000 Factory supplies 60,000 Total variable Fixed overhead costs Depreciation 240,000 Supervision 120,000 Property taxes 96,000 Total fixed 456,000 Total costs \ 1.236000 The relevant range for monthly activity is expected to be between 8000 and 12000 direct labor hours. Instructions Prepare a flexible budget for a monthly activity level of 8000 and 9000 direct labor hours.

(Essay)
4.8/5
(86)

A responsibility report for a profit center will

(Multiple Choice)
5.0/5
(79)

At zero direct labor hours in a flexible budget graph the total budgeted cost line intersects the vertical axis at $30000. At 15000 direct labor hours a horizontal line drawn from the total budgeted cost line intersects the vertical axis at $90000. Fixed and variable costs may be expressed as:

(Multiple Choice)
4.9/5
(84)

A flexible budget report will show both actual and budget cost based on the actual activity level achieved.

(True/False)
4.9/5
(92)

A formula used in developing a flexible budget is: Total budgeted cost = fixed cost + (total variable cost per unit × activity level).

(True/False)
5.0/5
(74)

Kevin Jarvis Industries produced 192000 units in 90000 direct labor hours. Production for the period was estimated at 198000 units and 99000 direct labor hours. A flexible budget would compare budgeted costs and actual costs respectively at

(Multiple Choice)
4.7/5
(76)

A cost is considered controllable at a given level of managerial responsibility if

(Multiple Choice)
4.8/5
(84)

Management by exception means that management will investigate areas where actual results differ from planned results if the items are material and controllable.

(True/False)
4.8/5
(82)

A static budget is an effective means to evaluate a manager's ability to control costs regardless of the actual activity level.

(True/False)
4.7/5
(71)

The formula for computing return on investment is controllable margin divided by average operating assets.