The Real Estate Products Division of McKenzie Co. is operated as a profit center. Sales for the division were budgeted for 2016 at $1250000. The only variable costs budgeted for the division were cost of goods sold ($610000) and selling and administrative ($80000). Fixed costs were budgeted at $130000 for cost of goods sold $120000 for selling and administrative and $95000 for noncontrollable fixed costs. Actual results for these items were: Sales \ 1,175,000 Cost of goods sold Variable 545,000 Fixed 140,000 Selling and administrative Variable 82,000 Fixed 100,000 Noncontrollable fixed 105,000 Instructions (a) Prepare a responsibility report for the Real Estate Products Division for 2016. (b) Assume the division is an investment center and average operating assets were $1200000. Compute ROI.

(Essay)
4.9/5
(81)

Smart Manufacturing budgeted costs for 50000 linear feet of block are: Fixed manufacturing costs $24,000\quad\quad\$ 24,000 per month Variable manufacturing costs $16.00\quad\$ 16.00 per linear foot Smart installed 40000 linear feet of block during March. How much is budgeted total manufacturing costs in March?

(Multiple Choice)
4.8/5
(87)

Cost centers profit centers and investment centers can all be classified as responsibility centers.

(True/False)
4.7/5
(82)

A department has budgeted monthly manufacturing overhead cost of $540000 plus $3 per direct labor hour. If a flexible budget report reflects $1044000 for total budgeted manufacturing cost for the month the actual level of activity achieved during the month was

(Multiple Choice)
4.9/5
(90)

A measure frequently used to evaluate the performance of the manager of an investment center is

(Multiple Choice)
4.8/5
(71)

In the Goblette Manufacturing Company indirect labor is budgeted for $108000 and factory supervision is budgeted for $36000 at normal capacity of 160000 direct labor hours. If 180000 direct labor hours are worked flexible budget total for these costs is:

(Multiple Choice)
4.7/5
(80)

Which responsibility centers generate both revenues and costs?

(Multiple Choice)
4.8/5
(73)

A flexible budget can be prepared for which of the following budgets comprising the master budget?

(Multiple Choice)
4.9/5
(77)

A manager of a cost center is evaluated mainly on

(Multiple Choice)
4.8/5
(70)

All of the following statements are correct about management by exception except it

(Multiple Choice)
5.0/5
(74)

What is the primary difference between a static budget and a flexible budget?

(Multiple Choice)
4.9/5
(77)

Perez Corp. reported the following: Beginning of year operating assets \ 3,200,000 End of year operating assets 3,000,000 Contribution margin 1,000,000 Sales 5,000,000 Controllable fixed costs 643,000 Its required return is 10%. Instructions Compute the company's ROI.

(Essay)
4.8/5
(77)

If an investment center has a $90000 controllable margin and $1200000 of sales what average operating assets are needed to have a return on investment of 10%?

(Multiple Choice)
4.9/5
(74)

The terms controllable costs and noncontrollable costs are synonymous with variable costs and fixed costs respectively.

(True/False)
4.7/5
(76)

The activity index used in preparing the flexible budget

(Multiple Choice)
4.8/5
(84)

A static budget report is appropriate for

(Multiple Choice)
4.9/5
(85)

Sydney Inc. uses flexible budgets. At normal capacity of 16000 units budgeted manufacturing overhead is $128000 variable and $360000 fixed. If Sydney had actual overhead costs of $500000 for 18000 units produced what is the difference between actual and budgeted costs?

(Multiple Choice)
4.8/5
(78)

The denominator in the formula for calculating the return on investment includes operating and nonoperating assets.

(True/False)
4.8/5
(86)

Certain budget reports are prepared monthly whereas others are prepared more frequently depending on the activities being monitored.

(True/False)
4.9/5
(77)

A master budget is most useful in evaluating a manager's performance in controlling costs.

(True/False)
4.8/5
(80)
Showing 41 - 60 of 213
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)