The basic notion of economies of scale is that as a plant gets larger and volume increases, the average cost per unit of output drops.

(True/False)
4.8/5
(74)

When evaluating capacity, managers need to consider both resource inputs and product outputs.

(True/False)
4.7/5
(84)

Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.

(True/False)
4.9/5
(77)

Compared with a service operation, a manufacturing operation's capacity is which of the following?

(Multiple Choice)
4.9/5
(85)

The capacity focus concept can be put into practice through a mechanism called which of the following?

(Multiple Choice)
4.8/5
(84)

The capacity utilization rate is found by dividing best operating level by capacity used.

(True/False)
4.8/5
(86)

The smaller the capacity cushion the better.

(True/False)
4.8/5
(81)

Best operating level is usually a multiple of the level of capacity for which a process was designed.

(True/False)
4.8/5
(64)

Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.

(True/False)
4.9/5
(77)

In practice, achieving a perfectly balanced plant is usually desirable but impossible.

(True/False)
4.8/5
(66)

If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion?

(Multiple Choice)
4.8/5
(81)

Capacity can be defined as the ability to hold, receive, store, or accommodate.

(True/False)
5.0/5
(76)

The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

(Multiple Choice)
4.9/5
(78)

Making adjustments to eliminate the variance between planned and actual output is tied into intermediate range capacity planning.

(True/False)
4.8/5
(70)

The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.

(True/False)
4.9/5
(70)

Overtime and personnel transfers are solutions to capacity problems in the intermediate term.

(True/False)
4.8/5
(81)

In a decision tree, the only time probabilities are applied to a decision node is when the decision is being made by someone else such as you customer or your competitor.

(True/False)
4.9/5
(78)

Best operating level is the volume of output at which average unit cost is minimized.

(True/False)
4.7/5
(81)