The term "assembly line" refers to progressive assembly linked by some material handling device.

(True/False)
4.8/5
(79)

A firm fills its customer's orders from finished goods inventory. It is a:

(Multiple Choice)
4.9/5
(69)

A high-level map or diagram of a supply chain process can be useful to understand how material flows and where inventory is held.

(True/False)
4.8/5
(81)

You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency?

(Multiple Choice)
4.8/5
(94)

Which of these expressions is Little's Law?

(Multiple Choice)
4.9/5
(84)

The assembly-line balancing procedure determines the precedence relationships of manufacturing tasks.

(True/False)
4.8/5
(82)

Work center layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.

(True/False)
4.9/5
(85)

The efficiency of an assembly-line is found by a ratio of the sum of all task times divided by the cycle time.

(True/False)
4.9/5
(78)

In designing a production layout a flexible line layout might have the shape of a "U".

(True/False)
4.9/5
(83)

A firm will work with a customer to design the product, and then make it from purchased materials, parts, and components. This firm is called:

(Multiple Choice)
4.8/5
(87)

Regarding the measures of inventory managing efficiency, identify the most appropriate answer. (Select all that apply.)

(Multiple Choice)
4.9/5
(84)

Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.

(True/False)
4.8/5
(90)

Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.

(True/False)
4.9/5
(72)

Which of the following is not a step in developing a manufacturing cell layout?

(Multiple Choice)
4.8/5
(74)

The volume requirements for the product are one determinant of the choice of which process structure to select.

(True/False)
4.9/5
(80)

In balancing an assembly line, workstation cycle time has to be less than the time between successive units coming off the end of the line.

(True/False)
4.9/5
(80)

Engineer-to-order firms will work with the customer to design the product, and then make it from purchased materials, parts, and components.

(True/False)
4.8/5
(73)

A process map shows the physical location of the various processes within a supply chain.

(True/False)
4.9/5
(71)

Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?

(Multiple Choice)
4.9/5
(82)