Exam 5: Network Design in the Supply Chain

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

If facilities have higher fixed costs,many local facilities are preferred because this helps lower transportation costs.

(True/False)
4.7/5
(79)

Inventory and facility costs increase as the number of facilities in a supply chain increase.

(True/False)
4.9/5
(77)

Supply chain network design decisions include

(Multiple Choice)
4.8/5
(76)

FlexSteal,marketed as a miracle brush-on sealant and baldness cure,is manufactured at three plants that are struggling to keep up with the demand at the four regional centers.The cost to ship a truckload from each of the existing plants to the regional centers is shown in the table.Note that the capacity and the total demand are both measured in truckloads. Philadelphia Atlanta Dallas Los Angeles Capacity Plant 1 89 75 93 115 400 Plant 2 120 88 103 93 400 Plant 3 95 82 112 98 400 Total Demand 350 350 350 350 The supply chain manager has explored plant construction costs in two other cities as well as the cost to ship a truckload from each of the plants to the regional centers.The current plan is to build another plant with a capacity of 400 to allow room for sales growth.The construction cost for the new plants and cost to ship to each of the regional centers is shown here. Philadelphia Atlanta Dallas Los Angeles Cost to Build Plant A 94 78 95 95 \ 23,500 Plant B 95 88 88 94 \ 26,000 -What is the constraint associated with Atlanta for the existing set of plants and regional centers?

(Multiple Choice)
4.9/5
(76)

The facilities in a supply chain network must

(Multiple Choice)
4.9/5
(74)

Models that minimize total costs are used

(Multiple Choice)
4.7/5
(85)

FlexSteal,marketed as a miracle brush-on sealant and baldness cure,is manufactured at three plants that are struggling to keep up with the demand at the four regional centers.The cost to ship a truckload from each of the existing plants to the regional centers is shown in the table.Note that the capacity and the total demand are both measured in truckloads. Philadelphia Atlanta Dallas Los Angeles Capacity Plant 1 89 75 93 115 400 Plant 2 120 88 103 93 400 Plant 3 95 82 112 98 400 Total Demand 350 350 350 350 The supply chain manager has explored plant construction costs in two other cities as well as the cost to ship a truckload from each of the plants to the regional centers.The current plan is to build another plant with a capacity of 400 to allow room for sales growth.The construction cost for the new plants and cost to ship to each of the regional centers is shown here. Philadelphia Atlanta Dallas Los Angeles Cost to Build Plant A 94 78 95 95 \ 23,500 Plant B 95 88 88 94 \ 26,000 -What is the constraint associated with Plant 2 for the existing set of plants and regional centers?

(Multiple Choice)
4.9/5
(75)
Showing 81 - 87 of 87
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)