Exam 5: Job-Order Costing
Exam 1: Introduction to Managerial Accounting64 Questions
Exam 2: Basic Managerial Accounting Concepts247 Questions
Exam 3: Cost Behavior237 Questions
Exam 4: Cost-Volume-Profit Analysis: a Managerial Planning Tool179 Questions
Exam 5: Job-Order Costing196 Questions
Exam 6: Process Costing177 Questions
Exam 7: Activity-Based Costing and Management178 Questions
Exam 8: Absorption and Variable Costing, and Inventory Management124 Questions
Exam 9: Profit Planning186 Questions
Exam 10: Standard Costing: a Managerial Control Tool180 Questions
Exam 11: Flexible Budgets and Overhead Analysis172 Questions
Exam 12: Performance Evaluation and Decentralization166 Questions
Exam 13: Short-Run Decision Making: Relevant Costing170 Questions
Exam 14: Capital Investment Decisions172 Questions
Exam 15: Statement of Cash Flows185 Questions
Exam 16: Financial Statement Analysis191 Questions
Select questions type
A schedule that is used to ensure accuracy in computing product costs is (are)
(Multiple Choice)
4.9/5
(92)
Brady Corporation has estimated overhead to be $250,000 for the year based on an estimated amount of direct labor hours of 40,000. Actual direct labor hours for the year are 41,500 and actual overhead is $258,900.
Required:
A.) Calculate the predetermined overhead rate.
B.) Calculate how much overhead has been applied.
C.) Calculate the overhead variance.
D.) Assuming that the variance is immaterial, prepare the journal entry to close the variance.
(Essay)
5.0/5
(75)
In job-order costing, the journal entry for a completed job costing $7,000 but not sold is:

(True/False)
4.8/5
(73)
When a job is completed but not sold, the accounts affected are
(Multiple Choice)
4.9/5
(71)
The three manufacturing cost elements are direct materials, direct labor, and overhead.
(True/False)
4.8/5
(80)
There are two major types of companies: those that use a job-order costing system and those that use process-costing systems. 
(Essay)
4.9/5
(75)
Match each item with the correct statement below.
-A costing system in which costs are collected and assigned to units of production for each individual job
(Multiple Choice)
4.9/5
(73)
Figure 5-10.The King Corporation manufactures custom-made furniture. The following data pertains to Job X4A:
Plantwide overhead rate is $22.50 per machine hour.
-Refer to Figure 5-10. Job X4A consists of 500 units. One-half of Job X4A was sold for $10,000. What is the cost per unit for Job X4A?
(Multiple Choice)
4.8/5
(84)
The document that lists the total cost for a single job is a
(Multiple Choice)
4.9/5
(73)
cost of materials is removed from materials account and added to work-in- process account
(Multiple Choice)
4.7/5
(71)
Figure 5-3.Mitchell's Softball Gloves Company estimated the following at the beginning of the year:
Mitchell uses departmental overhead rates. In the assembly department, direct labor hours are used to apply overhead. Machine hours are used to apply overhead in the testing department.Actual data for August is as follows:
-Refer to Figure 5-3. Mitchell decides to continue using departmental overhead rates. What are the predetermined rates for the Assembly and Testing departments respectively?
(Multiple Choice)
4.9/5
(85)
________________________ are directly responsible for creating the products or services sold to customers.
(Short Answer)
4.7/5
(81)
Match each item with the correct statement below.
-The amount by which actual overhead exceeds applied overhead
(Multiple Choice)
4.9/5
(79)
Match each item with the correct statement below.
-An approach that assigns actual costs of direct materials, direct labor, and overhead to products
(Multiple Choice)
4.7/5
(82)
Match each item with the correct statement below.
-The amount by which applied overhead exceeds actual overhead
(Multiple Choice)
4.9/5
(80)
Pribil Farm Equipment is a job-order costing manufacturer that uses a plantwide overhead rate based on direct labor hours. Estimations for the year include $420,000 in overhead and 30,000 direct labor hours. Pribil worked on five jobs in March. Data are as follows:
By March 31, Jobs 89 and 91 were completed and sold. The rest of the jobs remained in process.

(Essay)
4.7/5
(79)
Which of the following are easy to trace to individual jobs?
(Multiple Choice)
4.8/5
(79)
Figure 5-14
Deluxe Design Company makes custom furniture. On December 1, there were two jobs in process, Job 683, with a cost of $14,200 and Job 684 with a cost of $23,500. Jobs 685, 686, and 687 were started during the month of December. Data on costs added during the month are as follows:
Overhead is applied to production at the rate of 80% of direct labor cost. Job 685 was completed on December 17. Job 684 was completed on December 21 and the client was billed at cost plus 45%. All other jobs remained in process.
-Refer to Figure 5-14.
Required:
A.) Determine the amount of overhead to apply to each job for the period.
B.) Calculate the cost of work-in-process at the end of the month.
C.) Calculate the cost of finished goods, assuming that finished goods inventory on December 1st was zero.
(Essay)
4.8/5
(79)
Match each item with the correct statement below.
-A costing system that accumulates production costs by process or by department for a given period of time
(Multiple Choice)
4.8/5
(73)
Showing 81 - 100 of 196
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)