Exam 12: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not listed in the textbook as a component of a lean supply chain?

(Multiple Choice)
4.9/5
(82)

One of the many lean techniques that have been successfully applied in service firms is leveling facility load.

(True/False)
4.8/5
(68)

Group technology is a philosophy wherein similar parts are grouped together and the processes required to make the parts are arranged as a work cell.

(True/False)
4.8/5
(74)

In implementing a lean production system you should work with suppliers to do which of the following?

(Multiple Choice)
4.8/5
(78)

In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 8 hours,what number of Kanban card sets is needed?

(Multiple Choice)
4.9/5
(71)

The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.

(True/False)
4.8/5
(75)

In implementing a lean production system you should work with suppliers to do which of the following?

(Multiple Choice)
4.8/5
(69)

In designing a lean production facility layout a designer should do which of the following?

(Multiple Choice)
4.8/5
(76)

Uniform plant loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.

(True/False)
4.9/5
(81)

You have been called in as a consultant to set up a Kanban control system.The first thing you do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5% of the demand during lead time.The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

(Multiple Choice)
4.8/5
(70)

Group technology includes the set of psychological tests and training exercises given to group workers to insure a high level of teamwork.

(True/False)
4.9/5
(69)

In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 25 per hour,the safety stock is 20% of the demand during lead time,the container size is 5,and the lead time to replenish an order is 5 hours,what is the number of Kanban card sets needed?

(Multiple Choice)
4.8/5
(75)

Group technology cells help to eliminate movement and queue (waiting)time between operations.

(True/False)
4.9/5
(80)

Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900's.

(True/False)
4.9/5
(80)

Value stream mapping is used to visualize product flows through various processing steps.

(True/False)
4.7/5
(76)

"Quality at the source" requires factory workers to become their own inspectors.

(True/False)
4.9/5
(73)

In a lean production system we expect to see which of the following?

(Multiple Choice)
4.9/5
(91)

Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the logistics activities.

(True/False)
4.9/5
(83)

JIT is typically applied to non-repetitive manufacturing.

(True/False)
4.9/5
(88)

In Japanese manufacturing automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks.

(True/False)
4.8/5
(84)
Showing 21 - 40 of 73
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)