Exam 6: Manufacturing Processes

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The term "assembly line" refers to progressive assembly linked by some material handling device.

(True/False)
4.8/5
(82)

One trade-off illustrated by the product-process matrix is between flexibility and cost.

(True/False)
4.7/5
(68)

The first step in balancing an assembly line is to specify the precedence relationships among tasks to be performed on the line.

(True/False)
5.0/5
(73)

make-to-order firm will work with the customer to design the product,and then make it from purchased materials,parts,and components.

(True/False)
4.8/5
(77)

For the purposes of assembly-line balancing,the required workstation cycle time is found by dividing production time per day by the required units of output per day.

(True/False)
4.8/5
(81)

Workstation cycle time is the time between successive units coming off the end of the assembly line.

(True/False)
4.7/5
(95)

In designing a production layout a flexible line layout might have the shape of a "U".

(True/False)
4.8/5
(77)

Which of the following is not a step in developing a manufacturing cell layout?

(Multiple Choice)
4.9/5
(92)

Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

(Multiple Choice)
4.8/5
(83)

In balancing an assembly line,workstation cycle time has to be less than the time between successive units coming off the end of the line.

(True/False)
4.7/5
(84)

Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

(Multiple Choice)
5.0/5
(88)

Which of the following is a basic type of process structure?

(Multiple Choice)
4.8/5
(77)

You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure.The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes.Which of the following is the correct value for the resulting line's efficiency?

(Multiple Choice)
4.8/5
(75)

Work center layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.

(True/False)
4.8/5
(65)

The placement of which of the following is not determined by production process organization decisions?

(Multiple Choice)
4.8/5
(60)

The volume requirements for the product are one determinant of the choice of which process structure to select.

(True/False)
4.9/5
(79)