Exam 4: Strategic Capacity Management
Exam 1: Operations and Supply Chain Management71 Questions
Exam 2: Strategy and Sustainability48 Questions
Exam 3: Forecasting90 Questions
Exam 4: Strategic Capacity Management55 Questions
Exam 4: PART-A: Learning Curves49 Questions
Exam 5: Projects Manufacturing and Service Processes72 Questions
Exam 6: Manufacturing Processes56 Questions
Exam 6: PART-A: Break-Even Analysis9 Questions
Exam 7: Service Processes76 Questions
Exam 8: Sales and Operations Planning58 Questions
Exam 9: Material Requirements Planning81 Questions
Exam 10: Quality Management and Six-Sigma Supply Chain Processes and Analytics129 Questions
Exam 11: Inventory Management100 Questions
Exam 12: Lean Supply Chains71 Questions
Exam 13: Global Sourcing and Procurement64 Questions
Exam 14: Location, Logistics and Distribution54 Questions
Select questions type
In a decision tree,the only time probabilities are applied to a decision node is when the decision is being made by someone else such as you customer or your competitor.
Free
(True/False)
4.8/5
(70)
Correct Answer:
False
Outsourcing is a common source of external capacity.
Free
(True/False)
4.9/5
(88)
Correct Answer:
True
In practice achieving a perfectly balanced plant is usually both impossible and undesirable.
Free
(True/False)
4.9/5
(83)
Correct Answer:
True
If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour,which of the following is the capacity utilization rate?
(Multiple Choice)
5.0/5
(87)
production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.
(True/False)
4.8/5
(81)
Because services cannot be stored for later use,service managers consider time as one of their supplies or resources.
(True/False)
4.8/5
(80)
When evaluating capacity,managers need to consider both resource inputs and product outputs.
(True/False)
4.8/5
(77)
The capacity focus concept can be put into practice through a mechanism called which of the following?
(Multiple Choice)
4.8/5
(80)
The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.
(True/False)
4.7/5
(74)
When a firm's design capacity is less than the capacity required to meet its demand,it is said to have a negative capacity cushion.
(True/False)
5.0/5
(81)
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity utilization rate?
(Multiple Choice)
4.9/5
(80)
In practice,achieving a perfectly balanced plant is usually desirable but impossible.
(True/False)
4.9/5
(71)
Capacity flexibility means having the ability to rapidly increase or decrease production levels,or to shift production capacity quickly from one product or service to another.
(True/False)
4.8/5
(81)
When deciding to add capacity to a factory which of the following need not be considered?
(Multiple Choice)
4.8/5
(83)
production facility works best when it focuses on a fairly limited set of production objectives.
(True/False)
4.7/5
(79)
The capacity utilization rate is found by dividing best operating level by capacity used.
(True/False)
4.8/5
(75)
Best operating level is the volume of output at which average unit cost is minimized.
(True/False)
4.9/5
(73)
The basic notion of economies of scale is that as a plant gets larger and volume increases,the average cost per unit of output drops.
(True/False)
4.7/5
(88)
Which of the following is not a step used in determining production capacity requirements?
(Multiple Choice)
4.9/5
(77)
Showing 1 - 20 of 55
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)