Which of the following is not a basic type of process structure?

Free
(Multiple Choice)
4.8/5
(85)
Correct Answer:
Verified

A

The efficiency of an assembly-line is found by a ratio of the sum of all task times divided by the cycle time.

Free
(True/False)
4.8/5
(80)
Correct Answer:
Verified

False

If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes.Thus,the theoretical minimum number of workstations is 5 using the assembly-line balancing procedure.

Free
(True/False)
5.0/5
(86)
Correct Answer:
Verified

True

Assembling-to-order means moving the customer order decoupling point from finished goods to components.

(True/False)
4.9/5
(89)

If the sum of the task times required to produce a product is 80 minutes and the cycle time for the same product is 15 minutes,the theoretical minimum number of workstations is 8 using the assembly-line balancing procedure.

(True/False)
4.7/5
(78)

The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.

(True/False)
4.9/5
(87)

Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.

(True/False)
5.0/5
(72)

Engineer-to-order firms will work with the customer to design the product,and then make it from purchased materials,parts,and components.

(True/False)
4.9/5
(82)

The product-process matrix shows the relationship between process structures and product volume and variety characteristics.

(True/False)
4.9/5
(81)

Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7,4,7,8,9,4,3,and 6 minutes,and the cycle time is 8 minutes?

(Multiple Choice)
4.9/5
(89)

firm fills its customer's orders from finished goods inventory.It is a:

(Multiple Choice)
4.8/5
(71)

When balancing an assembly line,which of the following is not a way to reduce the longest task time below the required workstation cycle time?

(Multiple Choice)
4.7/5
(81)

Using the assembly-line balancing procedure,which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4,6,7,2,6,and 5 minutes,and the cycle time is 10 minutes?

(Multiple Choice)
5.0/5
(90)

The time needed to respond to a customer's order is called the customer response time.

(True/False)
4.7/5
(76)

One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.

(True/False)
5.0/5
(68)

project layout is characterized by a relatively low number of units produced in comparison with process and product layout formats.

(True/False)
4.8/5
(81)

Which of these expressions is Little's Law?

(Multiple Choice)
5.0/5
(80)

According to Little's Law,which of the following can be used to estimate work-in-process inventory?

(Multiple Choice)
4.8/5
(85)

A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.

(True/False)
4.7/5
(78)

Using the assembly-line balancing procedure,which of the following is the required cycle time if the production time in minutes per day is 1440 and the required output per day in units is 2000?

(Multiple Choice)
4.9/5
(80)
Showing 1 - 20 of 56