The least unit cost method of lot-sizing adds ordering,stock-out,and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.

(True/False)
4.8/5
(93)

Freezing the master schedule is:

(Multiple Choice)
4.9/5
(89)

MRP is most valuable where a number of products are made in batches using the same productive equipment.

(True/False)
4.8/5
(79)

The least total cost method (LTC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.

(True/False)
4.9/5
(67)

In a net change MRP program,a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.

(True/False)
4.8/5
(83)

Which of the following is most closely related to the reason a firm might implement MRP?

(Multiple Choice)
4.9/5
(59)

MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.

(True/False)
4.8/5
(71)

Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?

(Multiple Choice)
4.9/5
(83)

The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).

(True/False)
5.0/5
(76)

Net change MRP reflects the exact status of each item managed by the system in "real time."

(True/False)
4.9/5
(81)

master production schedule is an input to a material requirements planning (MRP)system.

(True/False)
4.8/5
(81)

In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.

(True/False)
4.9/5
(75)

An output of MRP is a bill of materials (BOM)file.

(True/False)
5.0/5
(72)

Which of the following is one of the main purposes of a MRP system?

(Multiple Choice)
4.8/5
(77)

The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to become more "lumpy."

(True/False)
4.8/5
(72)

Which of the following is an input to the master production schedule (MPS)?

(Multiple Choice)
4.8/5
(76)

Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding)each item in a product structure file and summing at all levels.

(True/False)
4.9/5
(70)

Which of the following is an input to the master production schedule?

(Multiple Choice)
4.9/5
(93)

The three main inputs to an MRP system are the bill of materials,the master schedule and the inventory records file.

(True/False)
4.8/5
(64)

The MRP program performs its analysis from the bottom up of the product structure trees,imploding requirements level by level.

(True/False)
5.0/5
(72)