Exam 9: Material Requirements Planning
Exam 1: Operations and Supply Chain Management71 Questions
Exam 2: Strategy and Sustainability48 Questions
Exam 3: Forecasting90 Questions
Exam 4: Strategic Capacity Management55 Questions
Exam 4: PART-A: Learning Curves49 Questions
Exam 5: Projects Manufacturing and Service Processes72 Questions
Exam 6: Manufacturing Processes56 Questions
Exam 6: PART-A: Break-Even Analysis9 Questions
Exam 7: Service Processes76 Questions
Exam 8: Sales and Operations Planning58 Questions
Exam 9: Material Requirements Planning81 Questions
Exam 10: Quality Management and Six-Sigma Supply Chain Processes and Analytics129 Questions
Exam 11: Inventory Management100 Questions
Exam 12: Lean Supply Chains71 Questions
Exam 13: Global Sourcing and Procurement64 Questions
Exam 14: Location, Logistics and Distribution54 Questions
Select questions type
The least unit cost method of lot-sizing adds ordering,stock-out,and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
(True/False)
4.8/5
(93)
MRP is most valuable where a number of products are made in batches using the same productive equipment.
(True/False)
4.8/5
(79)
The least total cost method (LTC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
(True/False)
4.9/5
(67)
In a net change MRP program,a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
(True/False)
4.8/5
(83)
Which of the following is most closely related to the reason a firm might implement MRP?
(Multiple Choice)
4.9/5
(59)
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
(True/False)
4.8/5
(71)
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?
(Multiple Choice)
4.9/5
(83)
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
(True/False)
5.0/5
(76)
Net change MRP reflects the exact status of each item managed by the system in "real time."
(True/False)
4.9/5
(81)
master production schedule is an input to a material requirements planning (MRP)system.
(True/False)
4.8/5
(81)
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
(True/False)
4.9/5
(75)
Which of the following is one of the main purposes of a MRP system?
(Multiple Choice)
4.8/5
(77)
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to become more "lumpy."
(True/False)
4.8/5
(72)
Which of the following is an input to the master production schedule (MPS)?
(Multiple Choice)
4.8/5
(76)
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding)each item in a product structure file and summing at all levels.
(True/False)
4.9/5
(70)
Which of the following is an input to the master production schedule?
(Multiple Choice)
4.9/5
(93)
The three main inputs to an MRP system are the bill of materials,the master schedule and the inventory records file.
(True/False)
4.8/5
(64)
The MRP program performs its analysis from the bottom up of the product structure trees,imploding requirements level by level.