Exam 12: Lean Supply Chains
Exam 1: Operations and Supply Chain Management71 Questions
Exam 2: Strategy and Sustainability48 Questions
Exam 3: Forecasting90 Questions
Exam 4: Strategic Capacity Management55 Questions
Exam 4: PART-A: Learning Curves49 Questions
Exam 5: Projects Manufacturing and Service Processes72 Questions
Exam 6: Manufacturing Processes56 Questions
Exam 6: PART-A: Break-Even Analysis9 Questions
Exam 7: Service Processes76 Questions
Exam 8: Sales and Operations Planning58 Questions
Exam 9: Material Requirements Planning81 Questions
Exam 10: Quality Management and Six-Sigma Supply Chain Processes and Analytics129 Questions
Exam 11: Inventory Management100 Questions
Exam 12: Lean Supply Chains71 Questions
Exam 13: Global Sourcing and Procurement64 Questions
Exam 14: Location, Logistics and Distribution54 Questions
Select questions type
Lean concepts discussed in the text do not include which of the following?
(Multiple Choice)
4.7/5
(77)
Company unions in Japan exist to foster a cooperative relationship with management.
(True/False)
4.8/5
(76)
You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25% of the demand during lead time.The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?
(Multiple Choice)
4.7/5
(83)
One of the few lean techniques that does not work well in service firms is demand-pull scheduling.
(True/False)
4.8/5
(75)
Value stream mapping is used to visualize product flows through various processing steps.
(True/False)
4.9/5
(81)
Group technology (GT)is credited with which of the following benefits?
(Multiple Choice)
4.8/5
(90)
In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 25 per hour,the safety stock is 20% of the demand during lead time,the container size is 5,and the lead time to replenish an order is 5 hours,what is the number of Kanban card sets needed?
(Multiple Choice)
5.0/5
(85)
In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 8 hours,what number of Kanban card sets is needed?
(Multiple Choice)
4.8/5
(73)
Group technology includes the set of psychological tests and training exercises given to group workers to ensure a high level of teamwork.
(True/False)
4.8/5
(67)
One of the aims of value stream mapping to eliminate waste in a process.
(True/False)
4.7/5
(84)
Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.
(True/False)
4.8/5
(84)
In a lean production system we expect to see which of the following?
(Multiple Choice)
4.8/5
(80)
Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.
(True/False)
4.7/5
(82)
An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced.is called which of the following?
(Multiple Choice)
4.9/5
(71)
Value stream mapping is used to identify all of the value-adding as well as non-value-adding processes that materials are subjected to within a plant.
(True/False)
5.0/5
(93)
Group technology cells help to eliminate movement and queue (waiting)time between operations.
(True/False)
4.8/5
(69)
Which of the following problems are not among those hidden when inventory levels are excessively high?
(Multiple Choice)
5.0/5
(91)
ln the context of a production process such as a manufacturing plant,what is the technique used to identify all of the value-adding as well as non-value-adding processes that materials are subjected to within a plant,from raw material coming into the plant through delivery to the customer?
(Multiple Choice)
4.8/5
(81)
Showing 21 - 40 of 71
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)