Exam 12: Lean Supply Chains

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Lean concepts discussed in the text do not include which of the following?

(Multiple Choice)
4.7/5
(77)

Company unions in Japan exist to foster a cooperative relationship with management.

(True/False)
4.8/5
(76)

You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25% of the demand during lead time.The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

(Multiple Choice)
4.7/5
(83)

One of the few lean techniques that does not work well in service firms is demand-pull scheduling.

(True/False)
4.8/5
(75)

kaizen burst is a symbol on a value stream map.

(True/False)
4.9/5
(82)

Value stream mapping is used to visualize product flows through various processing steps.

(True/False)
4.9/5
(81)

JIT is typically applied to nonrepetitive manufacturing.

(True/False)
4.8/5
(95)

Group technology (GT)is credited with which of the following benefits?

(Multiple Choice)
4.8/5
(90)

In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 25 per hour,the safety stock is 20% of the demand during lead time,the container size is 5,and the lead time to replenish an order is 5 hours,what is the number of Kanban card sets needed?

(Multiple Choice)
5.0/5
(85)

In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 8 hours,what number of Kanban card sets is needed?

(Multiple Choice)
4.8/5
(73)

Group technology includes the set of psychological tests and training exercises given to group workers to ensure a high level of teamwork.

(True/False)
4.8/5
(67)

One of the aims of value stream mapping to eliminate waste in a process.

(True/False)
4.7/5
(84)

Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.

(True/False)
4.8/5
(84)

In a lean production system we expect to see which of the following?

(Multiple Choice)
4.8/5
(80)

Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.

(True/False)
4.7/5
(82)

An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced.is called which of the following?

(Multiple Choice)
4.9/5
(71)

Value stream mapping is used to identify all of the value-adding as well as non-value-adding processes that materials are subjected to within a plant.

(True/False)
5.0/5
(93)

Group technology cells help to eliminate movement and queue (waiting)time between operations.

(True/False)
4.8/5
(69)

Which of the following problems are not among those hidden when inventory levels are excessively high?

(Multiple Choice)
5.0/5
(91)

ln the context of a production process such as a manufacturing plant,what is the technique used to identify all of the value-adding as well as non-value-adding processes that materials are subjected to within a plant,from raw material coming into the plant through delivery to the customer?

(Multiple Choice)
4.8/5
(81)
Showing 21 - 40 of 71
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)