Exam 3: Managing Systems Projects

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Often, two or more concurrent tasks depend on a single prior task, which is called a successor task.

Free
(True/False)
4.8/5
(88)
Correct Answer:
Verified

False

  -In the project planning process, a(n) ____________________ is any work that has a beginning and an end and requires the use of company resources. -In the project planning process, a(n) ____________________ is any work that has a beginning and an end and requires the use of company resources.

Free
(Short Answer)
4.8/5
(75)
Correct Answer:
Verified

task
activity

  -Instead of training a project as one large task, you break the project down into a series of smaller tasks, called a(n) ____________________. -Instead of training a project as one large task, you break the project down into a series of smaller tasks, called a(n) ____________________.

Free
(Essay)
4.9/5
(98)
Correct Answer:
Verified

WBS
work breakdown structure
work breakdown structure (WBS)
WBS (work breakdown structure)

A project manager, or project leader, usually is a senior systems analyst or an IT department manager if the project is large.

(True/False)
4.8/5
(83)

Effective project reporting requires ____.

(Multiple Choice)
4.8/5
(91)

If any task along the critical path falls behind schedule, the entire project is delayed.

(True/False)
5.0/5
(62)

  -____________________ can involve dependent tasks, multiple successor tasks, and multiple predecessor tasks. -____________________ can involve dependent tasks, multiple successor tasks, and multiple predecessor tasks.

(Short Answer)
4.7/5
(76)

Generally, systems analysts review the work of other systems analysts, and programmers review the work of other programmers, as a form of peer review, in structured walk-throughs.

(True/False)
4.9/5
(72)

A project manager's scheduling function _____.

(Multiple Choice)
4.9/5
(87)

A project manager's planning _____.

(Multiple Choice)
4.8/5
(75)

  -____________________ is software that can assist in project planning, estimating, scheduling, monitoring, and reporting. -____________________ is software that can assist in project planning, estimating, scheduling, monitoring, and reporting.

(Short Answer)
4.8/5
(81)

  -The ____________________ is the time that a task is scheduled to be completed. -The ____________________ is the time that a task is scheduled to be completed.

(Short Answer)
4.9/5
(83)

A continuous risk-tracking process can ____.

(Multiple Choice)
4.8/5
(83)

Which of the following are metrics of a successful project ____.

(Multiple Choice)
4.7/5
(89)

Two or more concurrent tasks often depend on a single prior task, which is called a(n) ____ task.

(Multiple Choice)
4.8/5
(93)

  -According to the concept called ____________________, adding manpower to a late software project only makes it later. -According to the concept called ____________________, adding manpower to a late software project only makes it later.

(Short Answer)
4.8/5
(87)

Which of the following is an example of an event?

(Multiple Choice)
4.9/5
(88)

When a project manager first recognizes that a project is in trouble, the options available to her include ____.

(Multiple Choice)
4.7/5
(87)

If team members lack experience with certain aspects of the required technology, temporary help might be obtained from IT consultants or part-time staff.

(True/False)
4.9/5
(78)

Quantitative risk analysis evaluates each risk by estimating the probability that it will occur and the degree of impact. _________________________

(True/False)
4.9/5
(79)
Showing 1 - 20 of 112