An advantage of Gantt charts in project management is that they identify which activities can be delayed without delaying the overall project.

(True/False)
4.9/5
(79)

The probability that the project will go beyond the desired time is equal to one minus the joint probability that all paths will be completed within the desired time.

(True/False)
4.8/5
(75)

Most likely time generally is at least as long as optimistic time.

(True/False)
4.8/5
(80)

Activity J has a duration of 7 and an earliest finish time of 21. If J's latest start time is 16, this must mean that J's slack is:

(Multiple Choice)
4.7/5
(78)

Which of the following is not characteristic of good risk management?

(Multiple Choice)
4.8/5
(63)

Consider the following work breakdown structure: Consider the following work breakdown structure:   What is the estimated expected (mean) time for project completion? What is the estimated expected (mean) time for project completion?

(Multiple Choice)
4.8/5
(72)

A project is represented by the following diagram: A project is represented by the following diagram:   The expected duration of this project is: The expected duration of this project is:

(Multiple Choice)
4.9/5
(87)

The task of identifying risks should involve everyone associated with the project.

(True/False)
4.8/5
(80)

The basis for use of the beta distribution in PERT is:

(Multiple Choice)
4.7/5
(80)

Which of the following would probably not involve the use of PERT?

(Multiple Choice)
4.9/5
(77)

Which of the following is not true about the use of dummy activities in project networking?

(Multiple Choice)
4.9/5
(81)

Which of the following is not a limitation of PERT and similar project-scheduling techniques?

(Multiple Choice)
4.9/5
(89)

Slack time is equal to LS-ES or LF-EF.

(True/False)
4.7/5
(77)

Once a project is underway, the project manager usually is not responsible for effectively managing:

(Multiple Choice)
4.8/5
(78)

When developing probabilistic estimates of project duration, it is necessary to know which of the following?

(Multiple Choice)
4.9/5
(74)

The higher the node number, the longer the activity will take.

(True/False)
4.9/5
(64)

To _____ an activity means to shorten the time it will take.

(Multiple Choice)
4.7/5
(73)

Consider the following work breakdown structure: Consider the following work breakdown structure:   What is the probability that this project will be completed within 130 days? What is the probability that this project will be completed within 130 days?

(Multiple Choice)
4.8/5
(86)

Which of the following is not typically treated as part of a project life cycle?

(Multiple Choice)
4.9/5
(71)

Consider the portion of a project depicted by this graph: Consider the portion of a project depicted by this graph:   What is the earliest finish time for activity 10-11 (far right-hand side) if the earliest start time of 8-10 (upper left-hand side) is 12 and the earliest start time of 9-10 (lower left-hand side) is 13? What is the earliest finish time for activity 10-11 (far right-hand side) if the earliest start time of 8-10 (upper left-hand side) is 12 and the earliest start time of 9-10 (lower left-hand side) is 13?

(Multiple Choice)
4.8/5
(88)
Showing 21 - 40 of 113
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)