Value stream mapping is a technique focused on finding new ways of adding value for critical stakeholders such as customers.

Free
(True/False)
4.9/5
(83)
Correct Answer:
Verified

False

Managers considering an operations strategy reflecting the lean philosophy of operations should recognize that lean:

Free
(Multiple Choice)
4.9/5
(71)
Correct Answer:
Verified

D

Which of the following contributes to the competitive advantage enjoyed by service firms using lean concepts?

Free
(Multiple Choice)
4.8/5
(91)
Correct Answer:
Verified

E

Preventive maintenance is additional maintenance done immediately after a breakdown has occurred to help prevent any further breakdowns.

(True/False)
4.7/5
(62)

In lean operations, a responsibility of the worker is to check the quality of their work.

(True/False)
4.9/5
(83)

A lean-systems method of asking questions about a process is the __________ approach.

(Multiple Choice)
4.7/5
(94)

A real advantage of the lean philosophy is the reduction of coordination effort required with supply chain partners.

(True/False)
4.9/5
(80)

Lean operations reduce the number of suppliers the organization works with by limiting contacts to two tiers of suppliers.

(True/False)
4.7/5
(81)

With regard to suppliers, lean systems typically require:

(Multiple Choice)
5.0/5
(73)

A system of lights used at each workstation to signal problems or slowdowns is:

(Multiple Choice)
4.8/5
(82)

"Autonomation" indicates that the firm is attempting to reduce its dependence on automated equipment.

(True/False)
4.7/5
(74)

For a company with a product mix of 40 percent of product A and 30 percent each of products B and C, which of the following mixed-model sequences best reflects the lean philosophy?

(Multiple Choice)
4.9/5
(79)

A benefit of small lot sizes in lean systems is that each product is produced less frequently.

(True/False)
4.9/5
(68)

In the Toyota Production System, waste and inefficiency are referred to as __________, and the ongoing effort to reduce this is referred to as __________.

(Multiple Choice)
4.8/5
(85)

A common objective of both MRP and the lean philosophy is to:

(Multiple Choice)
4.9/5
(96)

Which of the following would you not expect to see in a lean environment?

(Multiple Choice)
4.9/5
(84)

Which of the following is not a benefit of small lot sizes in lean systems?

(Multiple Choice)
4.9/5
(86)

Which of the following is not characteristic of preventive maintenance in lean systems?

(Multiple Choice)
5.0/5
(81)

A requirement of lean systems is that lead times are increased, allowing more time for processing.

(True/False)
4.9/5
(92)

In lean operations, when work is completed at one work center, it is important to immediately move the completed work to the next work center to minimize idle time.

(True/False)
4.9/5