Exam 12: Scheduling
Exam 1: Earth Retention9 Questions
Exam 2: Earth Structures7 Questions
Exam 3: Earthworks11 Questions
Exam 4: Estimation14 Questions
Exam 5: Foundations8 Questions
Exam 6: Hydraulics Closed10 Questions
Exam 7: Hydraulics Open12 Questions
Exam 8: Hydrology10 Questions
Exam 9: Material Mechanics8 Questions
Exam 10: Material QC11 Questions
Exam 11: Member Design10 Questions
Exam 12: Scheduling12 Questions
Exam 13: Soil and Materials10 Questions
Exam 14: Soil Mechanics9 Questions
Exam 15: Struct Loading8 Questions
Exam 16: Struct Materials9 Questions
Exam 17: Struct Analysis4 Questions
Exam 18: Subsurface10 Questions
Exam 19: Transportation56 Questions
Exam 20: Waste Water10 Questions
Exam 21: Water Treatment10 Questions
Select questions type
Using the three-point estimate technique, what is the estimated time to complete a project based on the following scenario?
Kyle has been appointed to draw up a cost estimate for a new project. He interviews one of the engineers, Steve, who tells Kyle his assigned task will take 3 weeks. Upon being questioned, Steve changes his estimated completion time to 7.5 weeks. Kyle thinks a realistic estimate is 4.5 weeks.
Free
(Multiple Choice)
4.8/5
(62)
Correct Answer:
B
Which of the following is a type of bar chart that graphically presents the project schedule, milestone dates, and deliverables?
Free
(Multiple Choice)
5.0/5
(84)
Correct Answer:
B
What critical path project management tool is used to define the steps needed to complete a project, the personnel to work on each task, and the cost of each task?
Free
(Multiple Choice)
4.9/5
(84)
Correct Answer:
A
Using the three-point estimate technique, what is the estimated time to complete a project based on the following scenario?
Debbie is preparing a statement of qualifications for a client who needs to hire an engineering firm to design a new outfall structure. Debbie needs an overall estimate of the time it may take to complete the project, even though many critical design issues are unknown. Debbie asks three engineers for their best guess. Steve thinks it will take only 1 year. Jenny estimates 3 years. Kyle, who has designed similar structures, thinks a realistic estimate is 2.5 years.
(Multiple Choice)
4.8/5
(67)
Which of the following terms is used to describe a project's progress when the required product, service, or system is not produced, provided, or constructed by a specific project milestone date?
(Multiple Choice)
4.9/5
(75)
Which of the following project management tools is used to evaluate a project's performance and progress by integrating the project scope, schedule and cost?
(Multiple Choice)
5.0/5
(83)
Which of the following best describes the scheduling term critical path?
(Multiple Choice)
4.9/5
(67)
Which of the following best describes the scheduling term float?
(Multiple Choice)
4.8/5
(75)
Which of the following project management tools is used to identify the tasks that can be delayed for a certain amount of time without having an effect on the overall schedule?
(Multiple Choice)
4.7/5
(72)
Which of the following best describes the scheduling term scope creep?
(Multiple Choice)
4.9/5
(79)
Which of the following is a basic support structure that needs to be created, defined, and/or modified for a complex construction project?
(Multiple Choice)
4.9/5
(70)
Which of the following project management tools is used to present a snapshot of the progress of the project?
(Multiple Choice)
5.0/5
(75)