Exam 4: Estimation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following statements correctly describes a construction cost estimate?

Free
(Multiple Choice)
4.9/5
(75)
Correct Answer:
Verified

D

ITE, LLC charges $125/hour for a Resident Engineer (RE) and $75/hour for an Inspector (I). Administrative staff hours are estimated to be 25% of RE and I time and are charged at $45 per hour. A profit rate of 10% is charged on total labor. If a project is estimated to take 10 weeks, and assuming a 40-hour work week for both the RE and I, what is the estimated marked-up labor cost?

Free
(Multiple Choice)
4.9/5
(88)
Correct Answer:
Verified

B

In which phase of a typical capital improvement project, such as building a highway or a flood control dam, is cost estimating undertaken?

Free
(Multiple Choice)
4.8/5
(94)
Correct Answer:
Verified

D

What is the sample mean of the following cost data? Supplier: Cost of Sonar Inspection Unit CUES:$ 80,000 RedZone: $ 92,500 Olsen Equipment: $ 92,500 Envirosight: $ 100,200 Collins: $ 140,000

(Multiple Choice)
4.9/5
(97)

What is the calculated overhead rate for an engineering firm that provides inspection and testing services given the following year-end audit information? Item: Cost ($) Direct Labor: 922,000 Allowable fringe benefits:452,000 Allowable general overhead: 1,200,000

(Multiple Choice)
4.8/5
(82)

What is the estimated labor budget for a 40-week project with the following staffing? Personnel - Hourly Billing Rate - Hours per Week Principal --- $185 --- 2 Resident Engineer --- $125 --- 32 Inspector --- $80 --- 40 Administrative Assistant --- $45 --- 10

(Multiple Choice)
4.8/5
(76)

If the nominal interest rate is 8.2% and the rate of inflation is 6.6%, what is the approximate real interest rate?

(Multiple Choice)
4.9/5
(83)

Which of the following is not generally considered a component of construction cost estimate preparation?

(Multiple Choice)
4.9/5
(83)

Which of the following cost estimating techniques is commonly used to develop planning level cost estimates?

(Multiple Choice)
4.9/5
(81)

Which of the following may be considered as an Unforeseen Condition?

(Multiple Choice)
4.8/5
(77)

Which of the following best describes the construction cost estimating term stagflation?

(Multiple Choice)
5.0/5
(81)

The Engineering News-Record (ENR) provides what is considered to be reliable general construction cost index (CCI) and building cost index (BCI) historic values. Which of the following statements best describes the use of ENR indexes?

(Multiple Choice)
4.8/5
(91)

What is the sample median of the following cost data? Supplier: Cost of Sonar Inspection Unit CUES:$ 80,000 RedZone: $ 92,500 Olsen Equipment: $ 92,500 Envirosight: $ 100,200 Collins: $ 140,000

(Multiple Choice)
4.9/5
(75)

Which of the following estimating techniques rely on a bottom-up approach to estimate construction costs?

(Multiple Choice)
4.9/5
(85)
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)