SPC charts typically have the most recent data point on the right hand side.
(True/False)
4.8/5
(79)
Some of the approaches used in Lean include station warning lights, tool boards and jidohka devices in order that which of these apply?
(Multiple Choice)
5.0/5
(80)
Measurement System Analysis is a procedure used to quantify variation of the method or system used for taking measurements.
(True/False)
4.8/5
(77)
If a Histogram displays two peaks the distribution would likely be _____________.
(Multiple Choice)
4.9/5
(93)
Hypothesis Tests determine the probabilities of differences between observed data and the hypothesis being solely due to _________ based on the result of the P-values.
(Multiple Choice)
4.9/5
(77)
The FMEA is used to analyze potential source of defects in the process of interest and stands for ________________________.
(Multiple Choice)
4.8/5
(91)
Six Sigma refers to a process whose output has at least 80% of its data points within +/- 6 Standard Deviations from the Mean.
(True/False)
5.0/5
(87)
A Stable process is a process whose output is consistent over time. A primary tool used to analyze Stability would be a ________________.
(Multiple Choice)
4.7/5
(88)
When utilizing Statistics the population is defined as a collection of all the individual data points of interest.
(True/False)
5.0/5
(87)
When constructing a Fishbone Diagram using the ________ approach is the most classic arrangement.
(Multiple Choice)
4.9/5
(82)
As a type of measurement error, Linearity describes a change in accuracy through the expected operating range of the measurement instrument.
(True/False)
4.7/5
(78)
The practice of utilizing Poka-Yoke is also known as ________________.
(Multiple Choice)
4.7/5
(83)
The Regression Model for an observed value of Y contains the term ?o which represents the Y axis intercept when X = 0.
(True/False)
4.8/5
(78)
The Mann-Whitney Test is used to test if the Means for two samples are different.
(True/False)
4.9/5
(81)
A Belt gathered the following defect data for a shoe production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be: Data: Cutting 38 Forming 17 Stitching 56 Sealing 42
(Multiple Choice)
4.9/5
(75)
What is the Cycle Time, in minutes, for a process having a Throughput of 360 units per hour?
(Multiple Choice)
4.8/5
(87)
A Belt experienced an Alpha of .05 and a Beta of .10 and knew these are the most common risk levels when running a Statistical test.
(True/False)
4.7/5
(68)
Measurement error is defined as the effect of all sources of measurement variability that caused an observed or measured value to deviate from the __________.
(Multiple Choice)
4.8/5
(86)
The Alpha level of a test (level of significance) represents the yardstick against which P-values are measured and the Null Hypothesis is rejected if the P-value is which of these?
(Multiple Choice)
4.9/5
(93)
Showing 41 - 60 of 114