Exam 5: Certified Six Sigma Black Belt
Exam 1: Certified Manager of Quality/Organizational Excellence150 Questions
Exam 2: Certified Quality Auditor95 Questions
Exam 3: Certified Quality Engineer148 Questions
Exam 4: Certified Quality Improvement Associate20 Questions
Exam 5: Certified Six Sigma Black Belt186 Questions
Exam 6: Six Sigma Green Belt114 Questions
Select questions type
To properly analyze the variables impacting the output of a process we need to collect data that represents at least 80% of the variation in the process and assure ourselves we are collecting data from all three types of variation which are _______________.
Free
(Multiple Choice)
4.9/5
(84)
Correct Answer:
A
On a _________________ one can see a pattern from the graphed points such that conclusions can be drawn about the largest family of Variation.
Free
(Multiple Choice)
4.9/5
(81)
Correct Answer:
A
Kaizens or Kaikakus and Six Sigma projects are intended to create incremental process improvements versus breakthrough, significant improvements.
Free
(True/False)
4.8/5
(85)
Correct Answer:
False
Which statement(s) are correct about the DOE Factorial plot output here? (Note: There are 3 correct answers). 
(Multiple Choice)
4.8/5
(82)
An example of the waste of mismanaged Inventory is __________.
(Multiple Choice)
4.9/5
(79)
Using this partial Z Table, how many units from a month's production run are expected to not satisfy customer requirements for the following process? Upper specification limit: 7.2 Lower specification limit: 4.3 Mean of the process: 5.9 Standard Deviation: 0.65 Monthly production: 450 units
(Multiple Choice)
4.8/5
(66)
Of the various types of data shown below which is NOT representative of Variable Data.
(Multiple Choice)
4.7/5
(74)
For a batch manufacturing process, while assessing short term process variation, which variation category(ies) should one need to focus on? (Note: There are 2 correct answers).
(Multiple Choice)
4.8/5
(65)
Which statements are correct about the advanced Capability Analysis shown here?
(Note: There are 3 correct answers).
(Multiple Choice)
4.9/5
(73)
Each of the items listed would impact the Process Capability for a process with a continuous output except ___________________.
(Multiple Choice)
4.9/5
(66)
Which statement(s) are incorrect for the Regression Analysis shown here? (Note: There are 2 correct answers). 
(Multiple Choice)
4.9/5
(81)
Those people who have an interest in the outputs of a process are known as _____________________.
(Multiple Choice)
4.8/5
(73)
Two of the key deliverables for the Measure Phase are a robust description of the process and its flow and an assessment of the Management System.
(True/False)
4.8/5
(71)
When doing Hypothesis Testing on Non-normal data Belts will use a ________________ to compare more than two sample proportions to each other.
(Multiple Choice)
4.8/5
(67)
Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the ______________.
(Multiple Choice)
4.9/5
(75)
When a Belt creates a Process Map she will use a __________________ to depict a decision point requiring a Yes or No decision.
(Multiple Choice)
4.9/5
(83)
Data that can be measured on a continuum and has meaningful decimal subdivisions are __________ data.
(Multiple Choice)
4.9/5
(68)
Which of the items listed do not define what an X-Y Diagram is?
(Multiple Choice)
4.7/5
(91)
What is the Ppk of a process with a spread of 24 units, an average of 68, an upper limit of 82 and a lower limit of 54?
(Multiple Choice)
4.9/5
(87)
Showing 1 - 20 of 186
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)