Exam 5: Certified Six Sigma Black Belt

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Contingency Tables are used to test for association, or dependency, between two or more classifications.  

(True/False)
4.9/5
(86)

Since Normality is required if we intend to use the data collected as a predictive tool. To test for Normality of data we must determine if the P-value is ___________.

(Multiple Choice)
4.9/5
(63)

Appropriate measures means that measurements are ______________.  

(Multiple Choice)
4.8/5
(80)

A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______________ .

(Multiple Choice)
4.7/5
(68)

When a Belt implements an improvement that is automated thus requiring no particular understanding for use he has applied which Lean tool?

(Multiple Choice)
4.9/5
(85)

Accuracy can be assessed in several ways and a fairly accurate means of measurement is visual comparison.

(True/False)
4.9/5
(77)

The Lean toolbox includes all of these items except ________________.      

(Multiple Choice)
4.9/5
(77)

When a Belt properly analyzes the results of an experiment he must examine the Residuals in expectation of finding all of the following except _________.

(Multiple Choice)
4.8/5
(67)

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?  

(Multiple Choice)
4.8/5
(84)

Handling of warranty returns, process improvement team meetings and rework to meet customer expectations are all examples of business costs that are classified as ________________ .

(Multiple Choice)
4.8/5
(81)

If an experiment has 5 factors and no replicates for a 2-level Experimental Design with 16 experimental runs which statement is incorrect?  

(Multiple Choice)
4.7/5
(72)

The Japanese born function of a Kaizen event utilizes a specific, step-by-step approach meant to bring about major changes to a process.

(True/False)
4.8/5
(76)

Use this data to calculate the Z Score.   Average of:  92, Standard Deviation:  2, Upper Spec Limit:  101

(Multiple Choice)
4.9/5
(79)

One of the foundations of Lean Six Sigma is the concept that the output of a process (Y) is influenced by the process inputs (X's) and is commonly shown as which formula?

(Multiple Choice)
4.8/5
(80)

Fractional Factorial, ____________and Response Surface Method are types of planned experiments.

(Multiple Choice)
4.9/5
(78)

Which of these elements are not included in Implementation plans?  

(Multiple Choice)
4.9/5
(89)

Sally bought a blender from her local appliance store.  When she changed blades the blender would not function.  For the manufacturer this would be categorized as what type of cost?

(Multiple Choice)
5.0/5
(84)

How many experimental runs exist in a Full Factorial and fully randomized design for 5 factors with 2 replicates for the Corner Points and no Center Points?  The factors in the experiment are only at 2-levels.  

(Multiple Choice)
4.8/5
(76)

Cost of Poor Quality (COPQ) can be classified as Visible Costs and Hidden Costs.  Which of these items is a Visible Cost?

(Multiple Choice)
4.9/5
(90)

A Belt has determined that the inventory of repair parts at a rework station can be reduced by 45%.  According to Cost of Poor Quality (COPQ) definitions inventory reduction would be considered _______________.  

(Multiple Choice)
4.9/5
(79)
Showing 21 - 40 of 186
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)