The installation of utility interactive solar photovoltaic systems has accelerated in recent years due to energy conservation and ____ concerns.

Free
(Multiple Choice)
4.8/5
(85)
Correct Answer:
Verified

A

Using the ____ and module frame grounding location specified in the module installation instructions is the only way to ensure connection integrity for the life of the system.

Free
(Multiple Choice)
4.8/5
(82)
Correct Answer:
Verified

D

The electrical energy produced by a photovoltaic system can be stored using ____ to supply the building's electrical needs at night or on overcast days.

Free
(Multiple Choice)
4.8/5
(79)
Correct Answer:
Verified

B

The equipment that converts the direct current produced by modules into an alternating current (ac)output is known as a(n)____.

(Multiple Choice)
4.9/5
(82)

Describe the requirement for a grounding electrode system for a utility interactive photovoltaic installation.

(Essay)
4.9/5
(81)

NEC 705.10 requires that a(n)____ that indicates all interconnected power sources for the premises be installed at the service and the location(s)of the power production source(s).

(Multiple Choice)
4.7/5
(77)

How can the photovoltaic effect can be put to practical use in a commercial building?

(Essay)
4.7/5
(67)

A ground-mounted photovoltaic module array for a commercial building may be constructed so that it can be used as ____.

(Multiple Choice)
4.9/5
(72)

The NEC requires all utility interactive inverters to be listed to UL 1741 . Please explain the two key requirements of the standard.

(Essay)
4.7/5
(66)

If additional grounding electrodes are used, they are connected directly to ____.

(Multiple Choice)
4.9/5
(82)

The maximum dc source current is defined by NEC 690.8(A)as the sum of parallel module rated short circuit currents multiplied by ____ percent.

(Multiple Choice)
4.8/5
(73)

What has the 2011 NEC required for arc-fault protection, and what are its three functions?

(Essay)
4.9/5
(83)

The general procedure for inverter startup is to check ____ and current levels from the source (modules)to inverter closing disconnects and compare with expected values.

(Multiple Choice)
4.8/5
(66)

Grounded conductors, whether dc or ac, must be identified with white or ____ insulation in accordance with NEC 200.6.

(Multiple Choice)
4.9/5
(75)

The plans for commercial PV projects usually have to be submitted to the ____ for review and comment prior to issuance of a permit.

(Multiple Choice)
4.9/5
(80)

What is the purpose of single-line diagram, and what information should it include?

(Essay)
4.9/5
(77)

A ____-line diagram is an electrical schematic diagram for the utility interactive PV system.

(Multiple Choice)
4.9/5
(74)

Ampacity correction for ____ temperature must be considered for both the dc and ac system conductors.

(Multiple Choice)
4.8/5
(74)

The most common material used today for production of photovoltaic cells is ____.

(Multiple Choice)
4.8/5
(70)

Photovoltaic modules in an array produce ____ electricity when exposed to sunlight.

(Multiple Choice)
4.8/5
(75)
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)