Exam 18: Linear Programming
Exam 1: Operations and Productivity138 Questions
Exam 2: Operations Strategy in a Global Environment134 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting148 Questions
Exam 5: Design of Goods and Services126 Questions
Exam 6: Managing Quality226 Questions
Exam 7: Process Strategies259 Questions
Exam 8: Location Strategies233 Questions
Exam 9: Human Resources, Job Design, and Work Measurement321 Questions
Exam 10: Supply Chain Management158 Questions
Exam 11: Inventory Management230 Questions
Exam 12: Aggregate Planning and Sop122 Questions
Exam 13: Material Requirements Planning Mrp and Erp133 Questions
Exam 14: Short-Term Scheduling124 Questions
Exam 15: Lean Operations122 Questions
Exam 16: Maintenance and Reliability119 Questions
Exam 17: Decision-Making Tools101 Questions
Exam 18: Linear Programming102 Questions
Exam 19: Transportation Models92 Questions
Exam 20: Waiting-Line Models126 Questions
Exam 21: Learning Curves114 Questions
Exam 22: Simulation78 Questions
Exam 23: Applying Analytics to Big Data in Operations Management61 Questions
Select questions type
In linear programming, a statement such as "maximize contribution" becomes a constraint when the problem is formulated.
(True/False)
4.7/5
(77)
For the following constraints, which point is in the feasible region of this minimization problem? (1) 14x + 6y ≥ 42 (2) x - y ≥ 5
(Multiple Choice)
4.8/5
(77)
Two methods of solving linear programming problems by hand include the corner-point method and the ________.
(Short Answer)
5.0/5
(82)
Riker Co. is considering which of 4 different projects to undertake in order to maximize its net present value (NPV). Define Xi as a binary variable that equals 1 if project i is undertaken and 0 otherwise, for i = 1, 2, 3, 4. The NPV and required capital (in millions) for each project are listed below.
Which of the following represents the constraint(s) stating that project 1 must be undertaken and at least one of the other projects must be undertaken?
(Multiple Choice)
4.7/5
(73)
What is the region that satisfies all of the constraints in linear programming called?
(Multiple Choice)
4.9/5
(87)
Explain how to use the iso-profit line in a graphical solution to maximization problem.
(Essay)
4.9/5
(82)
Riker Co. is considering which of 4 different projects to undertake in order to maximize its net present value (NPV). Define Xi as a binary variable that equals 1 if project i is undertaken and 0 otherwise, for i = 1, 2, 3, 4. The NPV and required capital (in millions) for each project are listed below.
What is the proper objective function?
(Multiple Choice)
4.9/5
(68)
The property manager of a city government issues chairs, desks, and other office furniture to city buildings from a centralized distribution center. Like most government agencies, it operates to minimize its costs of operations. In this distribution center, there are two types of standard office chairs, Model A and Model B. Model A is considerably heavier than Model B, and costs $20 per chair to transport to any city building; each model B costs $14 to transport. The distribution center has on hand 400 chairs-200 each of A and B.
The requirements for shipments to each of the city's buildings are as follows:
Building 1 needs at least 100 of A
Building 2 needs at least 150 of B.
Building 3 needs at least 100 chairs, but they can be of either type, mixed.
Building 4 needs 40 chairs, but at least as many B as A.
Formulate this problem as a linear program.
(Essay)
4.7/5
(73)
Linear programming is an appropriate problem-solving technique for decisions that have no alternative courses of action.
(True/False)
4.8/5
(82)
The feasible region in the diagram below is consistent with which one of the following constraints? 
(Multiple Choice)
4.9/5
(86)
In linear programming, if there are three constraints, each representing a resource that can be used up, the optimal solution may not use up all of each of the three resources.
(True/False)
4.9/5
(86)
________ are restrictions that limit the degree to which a manager can pursue an objective.
(Short Answer)
4.9/5
(88)
Computer software provides a simple way to guarantee only integer solutions to linear programming problems.
(True/False)
4.7/5
(82)
A linear programming problem contains a restriction that reads "the quantity of Q must be no smaller than the sum of R, S, and T." Formulate this as a linear programming constraint.
(Multiple Choice)
5.0/5
(72)
A linear programming problem contains a restriction that reads "the quantity of Q must be at most as large as the sum of R, S, and T." Formulate this as a linear programming constraint.
(Essay)
4.8/5
(70)
A linear programming problem has two constraints 2X + 4Y ≥ 100 and 1X + 8Y ≤ 100, plus nonnegativity constraints on X and Y. Which of the following statements about its feasible region is TRUE?
(Multiple Choice)
4.8/5
(87)
What combination of a and b will yield the optimum for this problem? Maximize $6a + $15b, subject to (1) 4a + 2b ≤ 16 and (2) 5a + 2b ≤ 20 and (3) a, b ≥ 0.
(Multiple Choice)
4.9/5
(64)
A stereo mail order center has 9,000 cubic feet available for storage of its private label loudspeakers. The ZAR3 speakers cost $255 each and require 6 cubic feet of space; the ZAR2ax speakers cost $120 each and require 3 cubic feet of space; and the ZAR4 model costs $60 and requires 1 cubic foot of space. The demand for the ZAR3 is at most 30 units per month. The wholesaler has $100,000 to spend on loudspeakers this month. Each ZAR3 contributes $125, each ZAR2ax contributes $55, and each ZAR4 contributes $25. The objective is to maximize total contribution. Formulate this problem as a linear program.
(Essay)
4.9/5
(81)
A linear programming problem contains a restriction that reads "the quantity of S must be no more than one-fourth as large as T and U combined." Formulate this as a linear programming constraint.
(Essay)
4.9/5
(91)
Showing 81 - 100 of 102
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)