Exam 18: Linear Programming
Exam 1: Operations and Productivity138 Questions
Exam 2: Operations Strategy in a Global Environment134 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting148 Questions
Exam 5: Design of Goods and Services126 Questions
Exam 6: Managing Quality226 Questions
Exam 7: Process Strategies259 Questions
Exam 8: Location Strategies233 Questions
Exam 9: Human Resources, Job Design, and Work Measurement321 Questions
Exam 10: Supply Chain Management158 Questions
Exam 11: Inventory Management230 Questions
Exam 12: Aggregate Planning and Sop122 Questions
Exam 13: Material Requirements Planning Mrp and Erp133 Questions
Exam 14: Short-Term Scheduling124 Questions
Exam 15: Lean Operations122 Questions
Exam 16: Maintenance and Reliability119 Questions
Exam 17: Decision-Making Tools101 Questions
Exam 18: Linear Programming102 Questions
Exam 19: Transportation Models92 Questions
Exam 20: Waiting-Line Models126 Questions
Exam 21: Learning Curves114 Questions
Exam 22: Simulation78 Questions
Exam 23: Applying Analytics to Big Data in Operations Management61 Questions
Select questions type
In sensitivity analysis, a zero shadow price (or dual value) for a resource ordinarily means that the resource has been used up.
(True/False)
4.8/5
(87)
In which of the following has LP been applied successfully?
(Multiple Choice)
4.9/5
(91)
The Queen City Nursery manufactures bags of potting soil from compost and topsoil. Each cubic foot of compost costs 20 cents and contains 4 pounds of sand, 3 pounds of clay, and 5 pounds of humus. Each cubic foot of topsoil costs 30 cents and contains 3 pounds of sand, 5 pounds of clay, and 7 pounds of humus. Each bag of potting soil must contain at least 12 pounds of sand, at least 15 pounds of clay, and at least 10 pounds of humus. Formulate the problem as a linear program. Plot the constraints and identify the feasible region. Graphically or with corner points find the best combination of compost and topsoil that meets the stated conditions at the lowest cost per bag. Identify the lowest cost possible.
(Essay)
4.8/5
(76)
Linear programming helps operations managers make decisions necessary to make effective use of resources such as machinery, labor, money, time, and raw materials.
(True/False)
4.8/5
(75)
The requirements of linear programming problems include an objective function, the presence of constraints, objective and constraints expressed in linear equalities or inequalities, and ________.
(Essay)
4.9/5
(67)
Which of the following is an algorithm for solving linear programming problems of all sizes?
(Multiple Choice)
4.9/5
(84)
A linear programming problem contains a restriction that reads "the quantity of X must be at most three times as large as the quantity of Y." Which of the following inequalities is the proper formulation of this constraint?
(Multiple Choice)
4.9/5
(83)
In a linear programming formulation, a statement such as "maximize contribution" becomes a(n):
(Multiple Choice)
4.8/5
(64)
One requirement of a linear programming problem is that the objective function must be expressed as a linear function.
(True/False)
4.9/5
(64)
In linear programming, statements such as "the blend must consist of at least 10% of ingredient A, at least 30% of ingredient B, and no more than 50% of ingredient C" cannot be made into valid constraints because the percentages do not add up to 100 percent.
(True/False)
4.8/5
(78)
The ________ is a mathematical expression in linear programming that maximizes or minimizes some quantity.
(Short Answer)
4.9/5
(84)
A manager must decide on the mix of products to produce for the coming week. Product A requires three minutes per unit for molding, two minutes per unit for painting, and two minutes for packing. Product B requires two minutes per unit for molding, four minutes for painting, and three minutes per unit for packing. There will be 600 minutes available for molding, 720 minutes for painting, and 480 minutes for packing. Both products have contributions of $1.50 per unit.
(a) Algebraically state the objective and constraints of this problem.
(b) Plot the constraints on the grid below and identify the feasible region.

(Essay)
4.8/5
(81)
Suppose that an iso-profit line is given to be X + Y = 10. Which of the following represents another iso-profit line for the same scenario?
(Multiple Choice)
4.8/5
(88)
A linear programming problem has three constraints, plus nonnegativity constraints on X and Y. The constraints are: 2X + 10Y ≤ 100; 4X + 6Y ≤ 100; 6X + 3Y ≥ 90. What is the largest quantity of X that can be made without violating any of these constraints?
(Multiple Choice)
4.8/5
(81)
Rienzi Farms grows sugar cane and soybeans on its 500 acres of land. An acre of soybeans brings a $1000 contribution to overhead and profit; an acre of sugar cane has a contribution of $2000. Because of a government program no more than 300 acres may be planted in soybeans. During the planting season 1500 hours of planting time will be available. Each acre of soybeans requires 2 hours, while each acre of sugar cane requires 5 hours. The company seeks maximum contribution (profit) from its planting decision. What is the maximum profit?
(Multiple Choice)
4.8/5
(94)
Based on the number of meals sold per day, Mr. Parker, the food service director at Woodland College, has determined that the following number of workers is needed for each day of the week:
Assume each worker will work consecutively for 5 days followed by 2 days off. Formulate the problem as an LP for Mr. Parker to minimize the total number of workers that must be hired.
(Essay)
4.9/5
(75)
Rienzi Farms grows sugar cane and soybeans on its 500 acres of land. An acre of soybeans brings a $1000 contribution to overhead and profit; an acre of sugar cane has a contribution of $2500. Because of a government program no more than 150 acres may be planted in soybeans. During the planting season 1800 hours of planting time will be available. Each acre of soybeans requires 2 hours, while each acre of sugar cane requires 6 hours. The company seeks maximum contribution (profit) from its planting decision.
(a) Formulate the problem as a linear program.
(b) Solve using the corner-point method.

(Essay)
4.7/5
(74)
The objective of a linear programming problem is to maximize 1.50A + 1.50B, subject to 3A + 2B ≤ 600, 2A + 4B ≤ 600, 1A + 3B ≤ 420, and A,B ≥ 0.
(a) Plot the constraints on the grid below.
(b) Identify the feasible region and its corner points. Show your work.
(c) What is the optimal product mix for this problem?

(Essay)
4.9/5
(88)
The optimal solution to a linear programming problem lies within the feasible region.
(True/False)
4.7/5
(86)
Showing 41 - 60 of 102
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)