The Sigma in Six Sigma refers to the ________.

(Multiple Choice)
4.8/5
(82)

What distinguishes Six Sigma from traditional continuous improvement?

(Essay)
4.9/5
(89)

Solution selection, solution implementation, control charts, and best practices are the tools used in the ________ stage of the DMAIC process.

(Multiple Choice)
4.8/5
(83)

In the context of Six Sigma, the acronym ppm stands for ________.

(Multiple Choice)
5.0/5
(85)

Evaluating the efficacy of a business case can be accomplished by asking if the case is reliable, understandable, meaningful, buyable, and accomplishable.

(True/False)
4.8/5
(83)

Which key player in Six Sigma is a specially trained individual who is a specialist?

(Multiple Choice)
4.8/5
(90)

Which key player in Six Sigma is trained in basic quality tools and works in teams to improve quality on less critical projects?

(Multiple Choice)
4.8/5
(73)

Six Sigma is a program begun at General Electric in 1982 by Jack Welch.

(True/False)
4.8/5
(77)

The loss caused by deviation from the target standard is $23.75 per unit and the Taguchi constant for the material is 95. What is the mean squared deviation (V) from the desired target value?

(Multiple Choice)
4.8/5
(78)

What is the Taguchi constant for a device that costs $400 to repair and a tolerance of plus or minus 0.5 mm with a mean squared deviation from the target of 0.3?

(Multiple Choice)
4.8/5
(76)

Describe the design phase of the DMAIC process. What are the four parts of the design phase?

(Essay)
4.7/5
(82)

The process of examining competing technologies to produce a product is known as ________.

(Multiple Choice)
4.7/5
(83)

The XY matrix is used to identify inputs and outputs from a project that has been mapped.

(True/False)
4.7/5
(74)

Tolerance design occurs before parameter design and is used to manipulate variables.

(True/False)
4.9/5
(73)

Gauge R&R is used to determine the consistency and thickness of materials.

(True/False)
4.8/5
(81)

The first step in the Taguchi process is ________.

(Multiple Choice)
4.9/5
(69)

In the ________ phase, projects are identified and selected.

(Multiple Choice)
4.9/5
(76)

Tools to maintain independence between successive trials of a Taguchi experiment are called ________.

(Multiple Choice)
4.8/5
(68)

The P-value in the ANOVA table shows what variables ________.

(Multiple Choice)
4.8/5
(77)

In the Six Sigma equation, Y = f(X), the variable X represents output or key business objectives.

(True/False)
4.7/5
(82)