Exam 13: Six Sigma Management and Lean Tools

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Six Sigma is popular with CEOs because it is more cost-reduction-oriented than traditional continuous improvement.

(True/False)
4.8/5
(74)

Pareto analysis of internal and external costs is a tool utilized during the analyze phase of DMAIC.

(True/False)
4.9/5
(84)

At the core of Six Sigma is the equation Y = f(X) where f represents ________.

(Multiple Choice)
4.9/5
(85)

The Pitman arm on a car costs $105 to repair. Compute the quality loss function for losses incurred as a result of deviation from a target where a tolerance of 10 mm plus or minus 0.15 mm is required and the mean squared deviation from the target is (0.16)2.

(Multiple Choice)
4.8/5
(67)

DMAIC is an acronym for ________.

(Multiple Choice)
4.9/5
(86)

The Pitman arm on a car costs $105 to repair. Compute the quality loss function for losses incurred as a result of deviation from a target where a tolerance of 10 plus or minus 0.8 is required and the mean squared deviation (V) from the target is (0.25)2.

(Multiple Choice)
4.7/5
(80)

What is the Taguchi constant for a device that costs $300 to repair and a tolerance of plus or minus 3 mm with a mean squared deviation from the target of 0.2?

(Multiple Choice)
4.7/5
(75)

The define, measure, analyze, design, and verify methodology pertains to ________.

(Multiple Choice)
4.9/5
(79)

When defining objectives in the analyze phase, you are attempting to determine what characteristics of the process need to be changed to achieve improvement.

(True/False)
4.9/5
(81)

The loss caused by deviation from the target standard is $13.75 per unit and the mean squared deviation (V) from the target value is (0.30)2. What is the Taguchi constant?

(Multiple Choice)
4.9/5
(70)

The analyze phase of a Six Sigma project is used to select an appropriate project for improvement.

(True/False)
4.8/5
(79)

Improper gauge training, use, and calibration may result in problems in gauge measurements.

(True/False)
4.8/5
(66)

At which company did Six Sigma originate?

(Multiple Choice)
4.9/5
(78)

The loss caused by deviation from the target standard is $15.47 per unit and the Taguchi constant for the material is 247. What is the mean squared deviation (V) from the desired target value?

(Multiple Choice)
4.9/5
(77)

In the Six Sigma equation, Y = f(X), the variable Y represents interrelationships to be managed.

(True/False)
4.8/5
(92)

A measurement systems analysis (MSA) is used to determine if measurements are consistent.

(True/False)
4.8/5
(73)

The loss caused by deviation from the target standard is $47.70 per unit and the mean squared deviation (V) from the target value is (0.50)2. What is the Taguchi constant?

(Multiple Choice)
4.8/5
(84)

Some quality practitioners are uncomfortable with Six Sigma's results orientation because ________.

(Multiple Choice)
4.9/5
(82)

What is the Taguchi constant for a device that costs $500 to repair and a tolerance of plus or minus 2 mm with a mean squared deviation from the target of 3?

(Multiple Choice)
5.0/5
(86)

The Pitman arm on a car costs $105 to repair. Compute the quality loss function for losses incurred as a result of deviation from a target where a tolerance of 10 plus or minus 0.2 is required and the mean squared deviation (V) from the target is (0.05)2.

(Multiple Choice)
5.0/5
(78)
Showing 41 - 60 of 101
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)