Exam 15: Wood Light-Frame Construction-I
Exam 1: An Overview of the Building Delivery Process How Buildings Come Into Being80 Questions
Exam 2: Design and Constructions Regulations75 Questions
Exam 3: Loads on Buildings77 Questions
Exam 4: Load Resistance the Structural Properties of Materials74 Questions
Exam 5: Properties of the Envelope-I Thermal Properties102 Questions
Exam 6: Properties of the Envelope-II Air and Water Vapor Control75 Questions
Exam 7: Fire and Smoke-Related Properties84 Questions
Exam 8: Acoustical Properties of Materials41 Questions
Exam 9: Principles of Joints and Sealants Expansion and Contraction Control54 Questions
Exam 10: Principles of Sustainable Construction71 Questions
Exam 11: Soils and Excavations68 Questions
Exam 12: Below-Grade Construction Foundation Systems and Basements55 Questions
Exam 13: Materials for Wood Construction-I Lumber89 Questions
Exam 14: Materials for Wood Construction-Ii Engineered Wood Products, Fasteners, and Connectors71 Questions
Exam 15: Wood Light-Frame Construction-I75 Questions
Exam 16: Wood Light-Frame Construction-II54 Questions
Exam 17: Structural Insulated Panel Construction24 Questions
Exam 18: Material Steel and Steel Components86 Questions
Exam 19: Structural Steel Construction55 Questions
Exam 20: Cold-Formed Steel Construction81 Questions
Exam 21: Lime, Portland Cement, and Concrete99 Questions
Exam 22: Concrete Construction-I Formwork, Reinforcement, and Slabs-On-Ground84 Questions
Exam 23: Concrete Construction-II Site-Cast and Precast Concrete Framing Systems60 Questions
Exam 24: Masonry Materials-I Mortar and Brick83 Questions
Exam 25: Masonry Materials-II Concrete Masonry Units, Natural Stone, and Glass Masonry Units76 Questions
Exam 26: Masonry and Concrete Bearing Wall Construction81 Questions
Exam 27: Exterior Wall Cladding-I Principles of Rainwater Infiltration Control42 Questions
Exam 28: Exterior Wall Cladding-II Masonry, Precast Concrete, and Gfrc98 Questions
Exam 29: Exterior Wall Cladding-III Stucco, Adhered Veneer, Eifs, Natural Stone, and Insulated Metal Panels89 Questions
Exam 30: Glass, Glazing, and Light-Transmitting Plastics94 Questions
Exam 31: Windows and Doors46 Questions
Exam 32: Exterior Wall Cladding-Iv Wall System in Glass49 Questions
Exam 33: Roofing-I Low-Slope Roofs107 Questions
Exam 34: Roofing-I Steep Roofs55 Questions
Exam 35: Stairs40 Questions
Exam 36: Floor Coverings53 Questions
Exam 37: Ceilings23 Questions
Select questions type
The type of WLF construction that has the largest amount of cross- grain lumber is a
(Multiple Choice)
4.8/5
(79)
In referring to a floor or roof of a building as a horizontal diaphragm, the reference is with respect to
(Multiple Choice)
4.7/5
(82)
In the building industry, the slope of a roof is generally expressed
(Multiple Choice)
4.9/5
(78)
With the help of three- dimensional sketches, show the configuration of a (a)gable- end roof, (b)hip- end roof, and (c)lean- to (shed)roof.
(Essay)
4.8/5
(88)
The most commonly used contemporary construction for midrise, multifamily residential buildings in the U.S. is podium construction. What is meant by a podium in this case?
(Essay)
4.8/5
(95)
In platform- frame construction, the wall framing, floor framing, and roof framing have one thing in common in that each is made of closely- spaced, parallel lumber members that are joined together at each end by a continuous cross member that is perpendicular to the parallel members. Name the cross members in floor framing, i.e., the members that connect the floor joists together.
(Short Answer)
4.8/5
(93)
The standard spacings of framing members in wood light- frame construction (such as studs, floor joists, and rafters)are 12 in., 16 in., or 24 in. What is the rationale behind these spacings?
(Essay)
5.0/5
(86)
In a podium- type building, the horizontal separation assembly must have a minimum fire rating of
(Multiple Choice)
5.0/5
(79)
The shortening in the height of wood light- frame construction (WLF)presents greater problems with increasing height of the structure. What are building code requirements in this respect?
(Essay)
4.8/5
(73)
The primary purpose of full- depth blocking in a floor frame is to
(Multiple Choice)
4.8/5
(78)
If a ridge beam is used in place of a ridge board in a two- way pitched roof, ceiling joists are unnecessary. Explain why.
(Essay)
4.8/5
(85)
In platform- frame construction, the wall framing, floor framing, and roof framing have one thing in common in that each is made of closely- spaced, parallel lumber members that are joined together at each end by a continuous cross member that is perpendicular to the parallel members. Name the cross members in wall framing, i.e., the members that connect the studs together.
(Essay)
4.8/5
(75)
Describe various functions of wall sheathing in a wood light- frame building.
(Essay)
4.9/5
(71)
Which of the two systems of wood frame construction-balloon frame and platform frame-is more dimensionally stable and why?
(Essay)
4.9/5
(79)
Showing 41 - 60 of 75
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)