For a given AQL and LTPD,which one of the following statements about the single-sampling plan is TRUE?

(Multiple Choice)
5.0/5
(73)

A double-sampling plan has n1 = 50,n2 = 100,c1 = 2,and c2 = 4.Suppose the first sample revealed two defectives.What should be done?

(Multiple Choice)
4.7/5
(70)

A single-sampling plan has n = 200 and c = 6.A sample is taken and five items are found to be defective.What should be done?

(Multiple Choice)
4.9/5
(81)

Which of the following is an example of a type II error?

(Multiple Choice)
5.0/5
(73)

A single-sampling plan by attributes is needed for a purchased component.Given the following information,what is the producer's risk? Table G.1 is appended to this exam. Sample size = 125 Acceptance number (c)= 4 Acceptance quality level (AQL )= 0.02 Lot tolerance proportion defective (LTPD)= 0.07

(Multiple Choice)
4.9/5
(83)

A double-sampling plan has n1 = 50,n2 = 100,c1 = 2,and c2 = 4.Suppose on the first sample,five defectives were discovered.How many total items will be inspected before a decision is reached?

(Multiple Choice)
4.8/5
(82)

A quality manager has established a sampling plan that calls for a sample size of 75 units from a shipment of 5000 pieces and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .04.What is the AOQ if the actual percentage of defectives in the lot is 2%? Table G.1 is appended to this exam.

(Multiple Choice)
4.9/5
(76)

A single-sampling plan by attributes is needed for a purchased component.Table G.1 is appended to this exam. Sample size = 80 Acceptance number (c)= 1 Acceptance quality level (AQL)= 0.02 Lot tolerance proportion defective (LTPD)= 0.06 Given the preceding information draw the AOQ curve and determine the AOQL.

(Essay)
4.8/5
(81)

If you were interested in minimizing the average number of items inspected,which type of sampling plan would you choose? Why?

(Essay)
4.9/5
(83)

A quality manager has established a sampling plan that calls for a sample size of 75 units and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .04.What is the AOQL? Table G.1 is appended to this exam.

(Multiple Choice)
4.9/5
(91)

A sample of 100 items is randomly selected from a shipment of incoming materials.AQL and LTPD have been established at 0.01 and 0.07,respectively.When four or more defective items are found in a sample,the shipment is rejected.What is the value of α? Table G.1 is appended to this exam.

(Multiple Choice)
4.7/5
(83)

An ideal OC curve is shaped like a ________.

(Essay)
4.9/5
(93)

Describe the process of a single-sampling plan.

(Essay)
4.8/5
(80)

A(n)________ is when the consumer randomly selects items from the lot and inspects them one by one.

(Essay)
4.9/5
(84)

The average outgoing quality (AOQ)is:

(Multiple Choice)
4.9/5
(89)

________ is an inspection procedure used to determine whether to accept or reject a specific quantity of material.

(Essay)
4.8/5
(67)

This OC curve represents a sampling plan developed for a lot size of 500,a sample size of 15,and an acceptance number of 2.The probability of acceptance for each of the first six points appears next to the plotted point.What is the average outgoing quality for an incoming fraction defective of 0.15? This OC curve represents a sampling plan developed for a lot size of 500,a sample size of 15,and an acceptance number of 2.The probability of acceptance for each of the first six points appears next to the plotted point.What is the average outgoing quality for an incoming fraction defective of 0.15?

(Multiple Choice)
4.8/5
(74)

A graph that demonstrates how well a sampling plan distinguishes between shipments that should be accepted and shipments that should be rejected is a(n)________.

(Essay)
4.8/5
(74)

This OC curve represents a single sampling plan conducted on a lot size of 200 with a sample size of 20 and an acceptance number of 1.The y-coordinates of the first few points have been labeled;the x coordinates appear on the x-axis.If the receiving company uses rectified inspection,what is the greatest fraction defective that will enter their production process? This OC curve represents a single sampling plan conducted on a lot size of 200 with a sample size of 20 and an acceptance number of 1.The y-coordinates of the first few points have been labeled;the x coordinates appear on the x-axis.If the receiving company uses rectified inspection,what is the greatest fraction defective that will enter their production process?

(Essay)
4.7/5
(84)

In general,a sequential sampling strategy will require a lower number of items be inspected if the actual percentage of defectives in the lot is ________.

(Essay)
4.9/5
(74)
Showing 61 - 80 of 87
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)