Exam 6: Capacity Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

An expansionist capacity strategy does all of the following EXCEPT:

(Multiple Choice)
4.9/5
(81)

One advantage of a smaller capacity cushion is that it is less expensive than a larger cushion.

(True/False)
4.8/5
(80)

Discuss the relationship between setup time and utilization.

(Essay)
4.8/5
(95)

Table 6.8 The Summerville Vitamin Company manufactures bottles of animal-shaped chewable vitamins for children.This product line requires two work centers,tablet manufacturing and packaging.The tablet manufacturing work center has a current capacity of 140,000 bottles per month,and packaging is capable of 100,000 units per month.This year (year 0),monthly sales of the product line are expected to reach 100,000 units.Growth per month is projected at an additional 25,000 units through year 4 (i.e. ,125,000 per month in year #1,150,000 per month in year #2,etc. ).Pre-tax profits are expected to be $5 per unit throughout the 4-year planning period.Two alternatives are being considered: -Use the information in Table 6.8.What is the pre-tax cash flow (net present value)for alternative #2 compared to the base case of doing nothing for the next four years?

(Multiple Choice)
4.8/5
(72)

Table 6.7 The B.Sharp Company has a rapidly growing product line that requires two work centers,X and Y for manufacture.Work Center X has a current capacity of 50,000 units per year,and Work Center Y is capable of 55,000 units per year.This year (year 0),sales of the product line are expected to reach 50,000 units.Growth is projected at an additional 3,000 units each year through year 3.Pre-tax profits are expected to be $60 per unit throughout the 3-year planning period.Two alternatives are being considered: -Use the information in Table 6.7.What is the pre-tax cash flow (net present value)for alternative #1 compared to the base case of doing nothing for the next five years?

(Multiple Choice)
5.0/5
(90)

Economies of scale drive down cost even though the cost of purchased materials can be expected to increase.

(True/False)
4.9/5
(86)

Input measures of capacity are inherently more accurate than output measures of capacity.

(True/False)
4.8/5
(75)

A process's ________ is the length of time it takes to switch from making one type of product to another.

(Essay)
4.9/5
(85)

________ occurs when the average cost per unit increases as the facility's size increases.

(Essay)
4.9/5
(77)

Table 6.2 High Tech,Inc.is producing two types of products: A and B.Both are produced at the same sawing operation.Because of demand uncertainties,the operations manager obtained three demand forecasts (pessimistic,expected,and optimistic).The demand forecasts,batch sizes (units/batch),processing times (hr/unit),and setup times (hr/batch)follow. Table 6.2 High Tech,Inc.is producing two types of products: A and B.Both are produced at the same sawing operation.Because of demand uncertainties,the operations manager obtained three demand forecasts (pessimistic,expected,and optimistic).The demand forecasts,batch sizes (units/batch),processing times (hr/unit),and setup times (hr/batch)follow.   The sawing machines operate on two 8-hour shifts,5 days per week,and 50 weeks per year.The manager wants to maintain a 10 percent capacity cushion. -Using the information from Table 6.2,if the operation currently has 18 machines and the manager is willing to expand capacity by 20 percent through short-term options,what is the capacity gap (in terms of number of machines)if you assume the optimistic demand forecasts? The sawing machines operate on two 8-hour shifts,5 days per week,and 50 weeks per year.The manager wants to maintain a 10 percent capacity cushion. -Using the information from Table 6.2,if the operation currently has 18 machines and the manager is willing to expand capacity by 20 percent through short-term options,what is the capacity gap (in terms of number of machines)if you assume the optimistic demand forecasts?

(Multiple Choice)
4.9/5
(91)

One reason economies of scale drive down cost is the spreading of fixed costs.

(True/False)
4.7/5
(84)

A firm may preempt the expansion of competitive firms by using an expansionist capacity strategy and announcing a large capacity expansion.

(True/False)
4.9/5
(83)

Table 6.2 High Tech,Inc.is producing two types of products: A and B.Both are produced at the same sawing operation.Because of demand uncertainties,the operations manager obtained three demand forecasts (pessimistic,expected,and optimistic).The demand forecasts,batch sizes (units/batch),processing times (hr/unit),and setup times (hr/batch)follow. Table 6.2 High Tech,Inc.is producing two types of products: A and B.Both are produced at the same sawing operation.Because of demand uncertainties,the operations manager obtained three demand forecasts (pessimistic,expected,and optimistic).The demand forecasts,batch sizes (units/batch),processing times (hr/unit),and setup times (hr/batch)follow.   The sawing machines operate on two 8-hour shifts,5 days per week,and 50 weeks per year.The manager wants to maintain a 10 percent capacity cushion. -Using the information from Table 6.2,what is the minimum total number of hours required of sawing equipment for the next year? The sawing machines operate on two 8-hour shifts,5 days per week,and 50 weeks per year.The manager wants to maintain a 10 percent capacity cushion. -Using the information from Table 6.2,what is the minimum total number of hours required of sawing equipment for the next year?

(Multiple Choice)
5.0/5
(72)

What is a capacity cushion? Provide examples of capacity cushions in a university setting and an automotive producer.

(Essay)
4.9/5
(81)

Output measures are used for estimating capacity requirements when product variety and process divergence are high.

(True/False)
5.0/5
(66)

A process's ________ is what its capacity should be for some future time period to meet the demand of its customers,allowing for the desired capacity cushion.

(Essay)
4.9/5
(77)

The single milling machine at Stout Manufacturing was severely overloaded last year.The plant operates eight hours per day,five days per week,and 50 weeks per year.Management prefers a capacity cushion of 15 percent.Two major types of products are routed through the milling machine.The annual demand for product A is 3000 units and 2000 units for product B.The batch size for A is 20 units and 40 units for B.The standard processing time for A is 0.5 hours/unit and 0.8 hours/unit for B.The standard setup time for product A is 2 hours and 8 hours for product B.How many new milling machines are required if Stout does not resort to any short-term capacity options?

(Multiple Choice)
4.9/5
(80)

If a system is well balanced,which one of the following changes usually calls for a larger capacity cushion?

(Multiple Choice)
4.9/5
(84)

Table 6.6 Burdell Labs is a diagnostic laboratory that does various tests (blood tests,urine tests,etc. )for doctors' offices in the Indianapolis area.Test specimens are picked up at the doctors' offices and are transported to the testing facility,with uniform arrivals throughout the day.All tests go through two testing centers in the testing facility,Test Center A and Test Center B.A has a current capacity of 1,000 units per week,and B is capable of 1,500 units per week.The facility operates 50 weeks per year.This year (year 0),test volumes are expected to reach 1,000 units per week.Growth per week is projected at an additional 200 units through year 5 (i.e. ,1,200 per week in year #1,1,400 per week in year #2,etc. ).Pre-tax profits are expected to be $5 per test throughout the 5-year planning period.Two alternatives are being considered: -Use the information in Table 6.6.What is the pre-tax cash flow (net present value)for alternative #1 compared to the base case of doing nothing for the next five years?

(Multiple Choice)
4.8/5
(78)

The degree to which equipment,space,or labor is being used is commonly referred to as:

(Multiple Choice)
4.7/5
(76)
Showing 101 - 120 of 133
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)