Exam 16: Resource Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

ERP revolves around a(n)________.

(Essay)
4.7/5
(83)

Use the bill of materials and inventory records to determine the additional quantities of purchased items necessary to assemble 20 end items if the manufacturer uses lot-for-lot ordering.There are no end items currently on hand,and none of the components have any scheduled receipts. Use the bill of materials and inventory records to determine the additional quantities of purchased items necessary to assemble 20 end items if the manufacturer uses lot-for-lot ordering.There are no end items currently on hand,and none of the components have any scheduled receipts.     Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials. Use the bill of materials and inventory records to determine the additional quantities of purchased items necessary to assemble 20 end items if the manufacturer uses lot-for-lot ordering.There are no end items currently on hand,and none of the components have any scheduled receipts.     Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials. Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials.

(Essay)
4.8/5
(80)

Which of the following statements about MRP II is best?

(Multiple Choice)
4.8/5
(88)

A component is an item that may go through one or more operations to be transformed into or become part of one or more parents.

(True/False)
5.0/5
(83)

The master production schedule (MPS)is the part of the material requirements planning that specifies when components must be ordered or assembled.

(True/False)
4.9/5
(68)

________ is an estimate of the amount of inventory available each week after gross requirements have been satisfied.

(Essay)
4.9/5
(72)

Case Study 16.1 Sunshine Manufacturing produces three products: X,Y,Z.The production of these end items is controlled by an MRP system.Each end item X is assembled with two components of A and one component of B.Each end item of Y is assembled with two components of C and one component of A.End item Z is assembled from one unit of D and one unit of C;D is manufactured from one unit of A;and C is manufactured from one unit of B. -Use the information in Case Study 16.1.If item C has a manufacturing lead time of two weeks,and a planned receipt of 65 units is needed in week 4,which of the following statements is TRUE?

(Multiple Choice)
5.0/5
(70)

Table 16.4 Consider the following MPS,BOM,and inventory data.Blank MRP records are provided at the end of this exam. Master Production Schedule: The following table shows the MPS start quantities. Table 16.4 Consider the following MPS,BOM,and inventory data.Blank MRP records are provided at the end of this exam. Master Production Schedule: The following table shows the MPS start quantities.   Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data   -Use the information in Table 16.4.Which one of the following statements about item E is TRUE? Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data Table 16.4 Consider the following MPS,BOM,and inventory data.Blank MRP records are provided at the end of this exam. Master Production Schedule: The following table shows the MPS start quantities.   Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data   -Use the information in Table 16.4.Which one of the following statements about item E is TRUE? -Use the information in Table 16.4.Which one of the following statements about item E is TRUE?

(Multiple Choice)
4.8/5
(92)

Part commonality tends to increase inventory costs.

(True/False)
4.8/5
(74)

The projected on-hand inventory in the MPS takes into account scheduled receipts,but not planned receipts.

(True/False)
4.9/5
(79)

Which of the following uses of MRP in promoting a healthy environment is NOT used?

(Multiple Choice)
4.8/5
(83)

Table 16.2 Table 16.2   -Use the following partially completed MRP record to answer the question.   What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1,2,3,4,5,and 6)? -Use the following partially completed MRP record to answer the question. Table 16.2   -Use the following partially completed MRP record to answer the question.   What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1,2,3,4,5,and 6)? What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1,2,3,4,5,and 6)?

(Multiple Choice)
4.8/5
(83)

Which one of the following statements about lot-sizing rules is TRUE?

(Multiple Choice)
4.9/5
(92)

The portion of the master production schedule farthest into the future is often frozen to reduce forecasting requirements.

(True/False)
4.9/5
(81)

MRP II ties MRP to the company's financial system.

(True/False)
4.7/5
(96)

Lot-for-lot (L4L)is a rule that maintains the same order quantity each time an order is issued.

(True/False)
4.7/5
(70)

Use the bill of materials and inventory records to determine the quantity of purchased items necessary to assemble 20 end items if the manufacturer uses lot-for-lot ordering.There are no end items currently on hand,and none of the components have any scheduled receipts. Use the bill of materials and inventory records to determine the quantity of purchased items necessary to assemble 20 end items if the manufacturer uses lot-for-lot ordering.There are no end items currently on hand,and none of the components have any scheduled receipts.     Use the bill of materials and inventory records to determine the quantity of purchased items necessary to assemble 20 end items if the manufacturer uses lot-for-lot ordering.There are no end items currently on hand,and none of the components have any scheduled receipts.

(Essay)
4.8/5
(85)

Which one of the following is an MRP lot-sizing rule that attempts to minimize the amount of average inventory?

(Multiple Choice)
4.9/5
(83)

Available-to-promise (ATP)quantities are only shown in the first period (if the projected on-hand inventory is greater than zero in the first period),and subsequently in periods when the MPS quantity is greater than 0.

(True/False)
4.9/5
(68)

Table 16.6 Table 16.6   -Use the information from Table 16.6.If an L4L lot-sizing rule is used,how many planned order releases are there for item XYZ? (Hint: The 80-unit scheduled receipt should remain unchanged,because it has already been released and is being worked on. ) -Use the information from Table 16.6.If an L4L lot-sizing rule is used,how many planned order releases are there for item XYZ? (Hint: The 80-unit scheduled receipt should remain unchanged,because it has already been released and is being worked on. )

(Multiple Choice)
4.9/5
(90)
Showing 21 - 40 of 149