Exam 23: Acceptance Sampling Plans
Exam 1: Using Operations to Compete107 Questions
Exam 2: Project Management151 Questions
Exam 3: Process Strategy149 Questions
Exam 4: Process Analysis192 Questions
Exam 5: Quality and Performance223 Questions
Exam 6: Capacity Planning133 Questions
Exam 7: Constraint Management160 Questions
Exam 8: Lean Systems179 Questions
Exam 9: Supply Chain Inventory Management216 Questions
Exam 10: Supply Chain Design93 Questions
Exam 11: Supply Chain Location Decisions126 Questions
Exam 12: Supply Chain Integration130 Questions
Exam 13: Supply Chain Sustainability and Humanitarian Logistics77 Questions
Exam 14: Forecasting183 Questions
Exam 15: Operations Planning and Scheduling191 Questions
Exam 16: Resource Planning149 Questions
Exam 17: Decision Making118 Questions
Exam 18: Waiting Line127 Questions
Exam 19: Special Inventory Models53 Questions
Exam 20: Linear Programming84 Questions
Exam 21: Simulation61 Questions
Exam 22: Financial Analysis60 Questions
Exam 23: Acceptance Sampling Plans88 Questions
Exam 24: Measuring Output Rates103 Questions
Exam 25: Learning Curve Analysis56 Questions
Exam 26: Operations Scheduling131 Questions
Select questions type
The AOQL is the highest point in the plot of AOQ against the percentage of defectives in the lot.
(True/False)
4.8/5
(90)
TABLE G.1 Cumulative Poisson Probabilities
-A single-sampling plan by attributes is needed for a purchased component.Table G.1 is appended to this exam.
Sample size = 80
Acceptance number (c)= 1
Acceptance quality level (AQL)= 0.02
Lot tolerance proportion defective (LTPD)= 0.06
Given the preceding information,draw the OC curve for this plan.
(Essay)
4.9/5
(77)
A(n)________ is when the consumer randomly selects items from the lot and inspects them one by one.
(Essay)
4.9/5
(76)
What is the basic idea of incoming inspection? Why does a producer perform it?
(Essay)
4.9/5
(81)
Rectified inspection occurs when all defective items in the lot are replaced with good items if the lot is rejected and any defective items in the samples are replaced if the lot is accepted.
(True/False)
4.8/5
(74)
A double-sampling plan is usually less expensive than a single-sampling plan if the lot has a high number of defectives.
(True/False)
4.9/5
(74)
For a given AQL and LTPD,which one of the following statements about the single-sampling plan is TRUE?
(Multiple Choice)
4.9/5
(77)
A small ________ can be disregarded in AOQ calculations involving an extremely large lot size.
(Essay)
4.8/5
(68)
If the sample size is increased and the acceptance level is unchanged,the OC curve will have a slope that is more negative.
(True/False)
4.8/5
(78)
A quality manager has established a sampling plan that calls for a sample size of 75 units from a shipment of 5000 pieces and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .04.What is the AOQ if the actual percentage of defectives in the lot is 2%? Table G.1 is appended to this exam.
(Multiple Choice)
4.8/5
(78)
A quality manager has established a sampling plan that calls for a sample size of 100 units and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.01 and an LTPD of .05.Which of the following statements is TRUE? Table G.1 is appended to this exam.
(Multiple Choice)
4.8/5
(71)
A quality manager has established a sampling plan that calls for a sample size of 75 units and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .04.What is the AOQL? Table G.1 is appended to this exam.
(Multiple Choice)
4.9/5
(75)
Acceptance sampling is an inspection procedure used to determine whether to accept or reject a specific quantity of material.
(True/False)
4.8/5
(77)
The distance between 1.0 and where the AQL intersects the OC curve is the value â (Beta).
(True/False)
4.8/5
(97)
A quality manager has established a sampling plan that calls for a sample size of 75 units and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .04.What is the consumer's risk? Table G.1 is appended to this exam.