The maximum value of the average outgoing quality over all possible values of the proportion defective is called the ________.

(Essay)
4.8/5
(70)

If the sample size is increased and the acceptance level is unchanged,the OC curve will have a higher consumer's risk.

(True/False)
4.7/5
(88)

A single-sampling plan by attributes is needed for a purchased component.Given the following information,what is the consumer's risk? Table G.1 is appended to this exam. Sample size = 50 Acceptance number (c)= 3 Acceptance quality level (AQL )= 0.01 Lot tolerance proportion defective (LTPD)= 0.04

(Multiple Choice)
4.9/5
(72)

Which one of the following alternatives will reduce the consumer's risk for a given AQL and LTPD?

(Multiple Choice)
4.9/5
(87)

A quality manager has established a sampling plan that calls for a sample size of 200 units and an acceptance number of 3.The supplier has agreed to a contract that calls for an AQL of 0.01 and an LTPD of .03.What is the producer's risk? Table G.1 is appended to this exam.

(Multiple Choice)
4.8/5
(77)

Which of the following is an example of a type II error?

(Multiple Choice)
4.9/5
(76)

________ is the risk that a lot with LTPD will be accepted-a type II error.

(Essay)
4.8/5
(68)

Why is an operating-characteristic (OC)curve useful?

(Essay)
4.7/5
(80)

A quality manager has established a sampling plan that calls for a sample size of 75 units and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .04.What is the producer's risk? Table G.1 is appended to this exam.

(Multiple Choice)
4.8/5
(73)

A graph that demonstrates how well a sampling plan distinguishes between shipments that should be accepted and shipments that should be rejected is a(n)________.

(Essay)
4.9/5
(69)

A single-sampling plan has n = 200 and c = 6.A sample is taken and five items are found to be defective.What should be done?

(Multiple Choice)
5.0/5
(82)

A company wants to develop an acceptance sampling plan that keeps the producer's risk at 0.03 or less and the customer's risk at 0.10 or less.The acceptable quality level (AQL)is 0.01,and the lot tolerance proportion defective (LTPD)has been set at 0.10.Which one of the following plans gives us the desired protection? Table G.1 is appended to this exam.

(Multiple Choice)
4.9/5
(86)

In general,a sequential sampling strategy will require a lower number of items be inspected if the actual percentage of defectives in the lot is ________.

(Essay)
4.8/5
(76)

Discuss the two incorrect conclusions that can be made when using acceptance sampling.

(Essay)
4.8/5
(88)

Lot tolerance proportion defective (LTPD)can be defined as the:

(Multiple Choice)
5.0/5
(85)

A quality manager has established a sampling plan that calls for a sample size of 50 units and an acceptance number of 1 The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .07.What is the consumer's risk? Table G.1 is appended to this exam.

(Multiple Choice)
4.9/5
(68)

This OC curve represents a sampling plan developed for a lot size of 500,a sample size of 15,and an acceptance number of 2.The probability of acceptance for each of the first six points appears next to the plotted point.What is the average outgoing quality for an incoming fraction defective of 0.15? This OC curve represents a sampling plan developed for a lot size of 500,a sample size of 15,and an acceptance number of 2.The probability of acceptance for each of the first six points appears next to the plotted point.What is the average outgoing quality for an incoming fraction defective of 0.15?

(Multiple Choice)
4.9/5
(81)

As more firms initiate total quality management systems,the need for acceptance sampling will increase.

(True/False)
4.8/5
(79)

A rectified inspection plan requires that:

(Multiple Choice)
4.7/5
(72)

A quality manager has established a sampling plan that calls for a sample size of 50 units and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .07.What is the producer's risk? Table G.1 is appended to this exam.

(Multiple Choice)
4.8/5
(78)