Exam 24: Measuring Output Rates
Exam 1: Using Operations to Compete107 Questions
Exam 2: Project Management151 Questions
Exam 3: Process Strategy149 Questions
Exam 4: Process Analysis192 Questions
Exam 5: Quality and Performance223 Questions
Exam 6: Capacity Planning133 Questions
Exam 7: Constraint Management160 Questions
Exam 8: Lean Systems179 Questions
Exam 9: Supply Chain Inventory Management216 Questions
Exam 10: Supply Chain Design93 Questions
Exam 11: Supply Chain Location Decisions126 Questions
Exam 12: Supply Chain Integration130 Questions
Exam 13: Supply Chain Sustainability and Humanitarian Logistics77 Questions
Exam 14: Forecasting183 Questions
Exam 15: Operations Planning and Scheduling191 Questions
Exam 16: Resource Planning149 Questions
Exam 17: Decision Making118 Questions
Exam 18: Waiting Line127 Questions
Exam 19: Special Inventory Models53 Questions
Exam 20: Linear Programming84 Questions
Exam 21: Simulation61 Questions
Exam 22: Financial Analysis60 Questions
Exam 23: Acceptance Sampling Plans88 Questions
Exam 24: Measuring Output Rates103 Questions
Exam 25: Learning Curve Analysis56 Questions
Exam 26: Operations Scheduling131 Questions
Select questions type
A job shop manager wants to determine the proportion of time the workers are idle.The shop employs two types of workers.Type 1 includes three workers and Type 2 includes two workers.The manager suspects that the proportion of idle time is about 20 percent for Type 1 workers and 15 percent for Type 2 workers.If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.05,how many trips will the observers have to take through the group?
(Multiple Choice)
4.9/5
(81)
As the sample size increases in a work sampling study,the maximum error decreases.
(True/False)
4.8/5
(75)
If a worker spends 10 hours per day performing a task,and the allowance for this task is 19 percent,how many hours during the average day is the worker involved in nonproductive activities?
(Multiple Choice)
5.0/5
(82)
The method used most often for setting time standards for a job is the:
(Multiple Choice)
4.8/5
(69)
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
-Use the information in Table H.1.What is the select time for work element 3?
(Multiple Choice)
4.9/5
(78)
The ________ is the average observed time based only on representative times.
(Essay)
4.9/5
(82)
A larger sample size is required when the job being studied is shorter in average duration.
(True/False)
4.9/5
(80)
An undergraduate business student studies diligently in the library during dead week in anticipation of an outstanding performance on her final exams.She asks a friend to spy on her at random intervals to determine what percentage of time she is actually studying.Over the course of three days,her friend records the following observations:
If the student wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.08,how many more observations are needed?
(Essay)
4.7/5
(82)
Table H.2
-Use the information in Table H.2.Which work element will take the longest for an average worker to perform per cycle?
(Multiple Choice)
4.8/5
(78)
An industrial engineer is conducting a time study for a work element.The select time is 7.5 minutes,and the sample standard deviation of the observed time is one minute.What is the appropriate sample size if the estimate is to be 3 percent of the true average time 95 percent of the time (z = 1.96)?
(Multiple Choice)
4.8/5
(87)
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
-Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.1 and all other elements receive a rating of 1.2.If work elements 1 and 3 are performed every other cycle,and elements 2 and 4 are performed every cycle,what is the normal time for the complete cycle?
(Multiple Choice)
4.9/5
(78)
The methods time measurement system is a predetermined data system.
(True/False)
4.9/5
(76)
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the standard time for this job element? 
(Multiple Choice)
4.8/5
(65)
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the select time for this job? 
(Multiple Choice)
4.7/5
(73)
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
-Use the information in Table H.3.What is the select time for work element 4?
(Multiple Choice)
5.0/5
(80)
A time study analysis was performed on a task with two work elements.The select times for these work elements are 21.0 seconds and 13.0 seconds,with rating factors of 1.1 and 1.2,respectively.Each work element is performed twice per cycle.If an allowance of 20 percent is used,what is the standard time for this task?