Exam 11: Standard Costs for Control: Flexible Budgets and Manufacturing Overhead
Exam 1: Management Accounting: Information for Creating Value and Managing Resources52 Questions
Exam 2: Management Accounting: Cost Terms and Concepts73 Questions
Exam 3: Cost Behaviour, Cost Drivers and Cost Estimation78 Questions
Exam 4: Product Costing Systems74 Questions
Exam 5: Process Costing and Operation Costing73 Questions
Exam 6: Service Costing78 Questions
Exam 7: A Closer Look at Overhead Costs85 Questions
Exam 8: Activity-Based Costing78 Questions
Exam 9: Budgeting Systems78 Questions
Exam 10: Standard Costs for Control: Direct Material and Direct Labour91 Questions
Exam 11: Standard Costs for Control: Flexible Budgets and Manufacturing Overhead97 Questions
Exam 12: Managing and Reporting Performance88 Questions
Exam 13: Financial Performance Measures and Incentive Schemes80 Questions
Exam 14: Strategic Performance Measurement Systems73 Questions
Exam 15: Managing Suppliers and Customers76 Questions
Exam 16: Managing Costs and Quality78 Questions
Exam 17: Sustainability and Management Accounting71 Questions
Exam 18: Cost Volume Profit Analysis97 Questions
Exam 19: Information for Decisions: Relevant Costs and Benefits95 Questions
Exam 20: Pricing and Product Mix Decisions95 Questions
Exam 21: Information for Capital Expenditure Decisions108 Questions
Select questions type
Carvelle Cabinets set the following standard cost per unit for 2008.The standards were set based on a capacity of 20 000 machine hours.During the year,5100 units were produced.How many units had Carvelle budgeted to produce?

Free
(Multiple Choice)
4.8/5
(85)
Correct Answer:
B
What can create the variable overhead efficiency variance?
Free
(Multiple Choice)
4.9/5
(75)
Correct Answer:
C
Universal Pty Ltd used a standard cost system to prepare the following budget at normal operating capacity for the month of January 2007.Actual data for January 2007 were as follows:
Using the two-way analysis of overhead variances,what is the total of the fixed budget variance and the variable overhead spending variance for January 2007?

Free
(Multiple Choice)
4.8/5
(75)
Correct Answer:
A
Use the following data to determine the company's fixed overhead volume variance for March. 
(Multiple Choice)
4.9/5
(85)
Adams Corporation has developed the following flexible budget formula for annual indirect labour cost: Total cost = $4800 + 50c per machine hour.Operating budgets for the current month are based on 20 000 hours of planned machine time.Calculate the amount of indirect labour costs included in this planning budget.
(Multiple Choice)
4.8/5
(73)
Which of the following is not an advantage of standard costing?
(Multiple Choice)
4.9/5
(80)
Bozo Pty Ltd uses a standard costing system for product costing.The company uses direct labour hours as the cost driver to apply overhead costs.The following amounts were budgeted for the year:
Calculate the total standard overhead rate per direct labour hour (variable and fixed). 
(Multiple Choice)
4.8/5
(66)
In the accounting recording system,unfavourable variances are recorded in a similar way to revenue and favourable variances are recorded in a similar way to expenses.
(True/False)
4.8/5
(87)
Z Company uses a variable costing system.There was no opening or closing stock.The following data is available:
Use this data to determine Z's sales volume variance:

(Multiple Choice)
4.8/5
(75)
A flexible budget is appropriate for a:
Sales commission budget
Direct material budget
Variable overhead budget
(Multiple Choice)
4.8/5
(74)
As overall productive activity changes,the following should move in the same direction,in roughly the same proportion:
(Multiple Choice)
4.9/5
(71)
DBC Company applies fixed overhead at $8 per machine hour.During the year actual fixed overhead amounted to $75 000 and the standard machine hours allowed for units produced was 11 000.Budgeted fixed overhead was $80 000.Which of the following is the best description of the items used to calculate the volume variance?
A.
$80 000
$88 000
ignore
B.
$88 000
$88 000
ignore
C.
$88 000
$75 000
ignore
D.
ignore
$88 000
$75 000
(Essay)
4.9/5
(85)
DBC Company applies fixed overhead at $8 per machine hour.During the year actual fixed overhead amounted to $75 000 and the standard machine hours allowed for units produced was 11 000.Budgeted fixed overhead was $80 000.Which of the following is the best description of the items used to calculate the volume variance?
Budgeted FOH
Applied FOH
Actual FOH
(Multiple Choice)
4.8/5
(75)
Security Doors has a standard variable overhead rate of $4 per direct labour hour.The standard quantity of direct labour per unit of production is 3 hours.The company's static budget was based on 50 000 units.Actual results for the year are as follows.What was Security Door's variable overhead efficiency variance?

(Multiple Choice)
4.7/5
(81)
Hamilton Pty Ltd uses a standard costing system for product costing.The company uses direct labour hours as the cost driver to apply overhead costs.The following amounts were budgeted for the year:
The following were the actual results:
Calculate the amount of variable overhead efficiency variance.

(Multiple Choice)
4.8/5
(86)
Which of the following statements relating to standard costs is false?
(Multiple Choice)
4.9/5
(83)
Although it is assumed that fixed overheads remain constant regardless of the level of activity,the total applied fixed overhead decreases with activity
(True/False)
4.7/5
(89)
Showing 1 - 20 of 97
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)