Exam 15: Material Requirements Planning Mrpand Erp

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

An order for 50 units of Product A and 60 of B has been placed.There are currently 25 units of Product B on hand.Each A requires 2 units of Part C; each B requires 5 units of C.There are 160 units of C available.What are the net requirements for C?

(Multiple Choice)
4.7/5
(57)

Which of the following lot-sizing techniques results in the lowest holding costs?

(Multiple Choice)
5.0/5
(71)

Consider the following product structure.Fifty units of Product A are needed.How many units of B,C,D,and E are needed? Consider the following product structure.Fifty units of Product A are needed.How many units of B,C,D,and E are needed?

(Essay)
4.9/5
(87)

The quantity required of a dependent demand item is computed from the demand for the final products in which the item is used.

(True/False)
4.8/5
(85)

In MRP,a "bucket" refers to a fixed order quantity,such as an EOQ.

(True/False)
4.8/5
(82)

It is week 1 and there are currently 20 As in stock.We need 300 As at the start of week 5.If there are scheduled receipts planned for week 3 and week 4 of 120 As each and A has a lead time of 1 week,when and how large of an order should be placed to meet the requirement of 300 As?

(Multiple Choice)
4.8/5
(78)

If 100 units of Q are needed and 10 are already in stock,then the gross requirement is 100 and the net requirement is 90.

(True/False)
4.7/5
(71)

By convention,the top level in a product structure is designated level 1.

(True/False)
4.8/5
(84)

Which of the following statements regarding lot-sizing is TRUE?

(Multiple Choice)
4.8/5
(78)

The supply-chain systems that result from using ERP in the grocery industry are called efficient consumer response (ECR)systems.

(True/False)
4.9/5
(64)

The lot-for-lot lot-sizing technique is particularly appropriate when demand is not very smooth and set up cost is small compared to holding cost.

(True/False)
4.9/5
(58)

Which of the following is NOT a key benefit of MRP?

(Multiple Choice)
4.9/5
(89)

A grill assembly takes 20 washers.Instead of listing these washers separately,they are grouped into a single kit for production.How is the bill of material for the washers classified?

(Multiple Choice)
4.9/5
(82)
Showing 101 - 113 of 113
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)