Exam 8: Capacity and Constraint Management
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
An organization whose capacity is on that portion of the average unit cost curve that falls as output rises:
(Multiple Choice)
4.8/5
(82)
Break-even analysis can be used by a firm that produces more than one product,but:
(Multiple Choice)
4.9/5
(84)
A retailer is considering building a large store.If the local economy experiences expansion,the firm expects the store to earn a $2,000,000 profit next year.If the local economy experiences a contraction,the firm expects the store to lose $400,000 next year.Analysts estimate a 20% chance for the local economy to experience an expansion next year (hence an 80% chance for contraction).What is the expected monetary value (EMV)of building the large store?
(Multiple Choice)
4.8/5
(83)
The bottleneck time is always at least as long as the throughput time.
(True/False)
4.9/5
(72)
Christopher's Cranks uses a machine that can produce 100 cranks per hour.The firm operates 12 hours per day,five days per week.Due to regularly scheduled preventive maintenance,the firm expects the machine to be running during approximately 95% of the available time.Based on experience with other products,the firm expects to achieve an efficiency level for the cranks of 85%.What is the expected weekly output of cranks for this company?
(Multiple Choice)
4.9/5
(71)
Consider a production line with five stations.Station 1 can produce a unit in 9 minutes.Station 2 can produce a unit in 10 minutes.Station 3 has two identical machines,each of which can process a unit in 12 minutes (each unit only needs to be processed on one of the two machines.Station 4 can produce a unit in 5 minutes.Station 5 can produce a unit in 8 minutes.Which station is the bottleneck station?
(Multiple Choice)
4.8/5
(84)
Multiproduct break-even analysis calculates the ________ of each product,________ it in proportion to each product's share of total sales.
(Short Answer)
4.7/5
(79)
A capacity alternative has an initial cost of $50,000 and cash flow of $20,000 for each of the next four years.If the cost of capital is 5 percent,what is the approximate net present value of this investment?
(Multiple Choice)
4.7/5
(83)
Which of the following techniques is NOT a technique for dealing with a bottleneck?
(Multiple Choice)
4.9/5
(78)
A graphic design studio is considering three new computers.The first model,A,costs $5000.Model B and C cost $3000 and $1000 respectively.If each customer provides $50 of revenue and variable costs are $20/customer,find the number of customers required for each model to break even.
(Essay)
4.8/5
(79)
Price changes are useful for matching the level of demand to the capacity of a facility.
(True/False)
4.9/5
(82)
The efficiency of a factory is 75% and its utilization 50%.If effective capacity is 1000 find design capacity.
(Essay)
4.8/5
(83)
A product is currently made in a process-focused shop,where fixed costs are $8,000 per year and variable cost is $40 per unit.The firm currently sells 200 units of the product at $200 per unit.A manager is considering a repetitive focus to lower costs (and lower prices,thus raising demand).The costs of this proposed shop are fixed costs = $24,000 per year and variable costs = $10 per unit.If a price of $80 will allow 400 units to be sold,what profit (or loss)can this proposed new process expect? Do you anticipate that the manager will want to change the process? Explain.
(Essay)
4.9/5
(83)
Design capacity is the theoretical maximum output of a system in a given period under ideal conditions.
(True/False)
4.9/5
(75)
Showing 81 - 96 of 96
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)