Exam 6: Network Design

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not a current trend that is making the traditional design approach less appropriate for today's networks?

(Multiple Choice)
4.7/5
(93)

Today, many organizations design networks using the building-block approach.

(True/False)
4.9/5
(77)

Which of the following is not included in the key deliverable for the needs assessment stage of the building-block network design process, the set of logical network diagrams?

(Multiple Choice)
4.9/5
(77)

The campus backbone or core layer) is the network architecture component responsible for providing end user access to the network.

(True/False)
4.8/5
(79)

A traditional network design approach follows a structured systems analysis and design process similar to that used in building applications.

(True/False)
4.8/5
(84)

In needs analysis:

(Multiple Choice)
4.9/5
(80)

Which of the following is not a main item for which network designers estimate costs for the proposed network?

(Multiple Choice)
4.8/5
(72)

The goals in the needs analysis step of network design are exactly the same when designing LANs vs.when designing WANs.

(True/False)
4.9/5
(90)

Describe the concept of linking the RFP to the vendor contract.

(Essay)
4.8/5
(89)

Which of the following is not directly contributing to the dramatic increase in network traffic today?

(Multiple Choice)
5.0/5
(83)

Which of the following is a way to sell the network proposal to management?

(Multiple Choice)
4.9/5
(86)

The goal of the needs analysis step is to produce a ___________, or a statement of the network elements necessary to meet the needs of the organization.

(Multiple Choice)
4.9/5
(82)

To establish circuit loading, the designer usually starts with the:

(Multiple Choice)
4.9/5
(64)

Today, all network traffic is due to traffic from internal application systems.

(True/False)
4.8/5
(80)

Networks requirements can be divided into mandatory, desirable, and wish-list requirements.

(True/False)
4.8/5
(84)

To estimate costs for large network purchases, organizations often:

(Multiple Choice)
4.8/5
(81)

Which of the following would not be a type of circuit that needs to be considered when planning for technology design capacity?

(Multiple Choice)
4.7/5
(77)

List and describe each of the seven network architecture components.

(Essay)
4.7/5
(79)

Cost assessment is used to look at the relative cost of technologies used in a network design.

(True/False)
4.8/5
(90)

The traditional network design approach does not work well for _________ networks.

(Multiple Choice)
4.9/5
(76)
Showing 41 - 60 of 76
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)