Exam 6: Network Design
Exam 1: Introduction to Data Communications82 Questions
Exam 2: Application Layer102 Questions
Exam 3: Physical Layer146 Questions
Exam 4: Data Link Layer101 Questions
Exam 5: Network and Transport Layers121 Questions
Exam 6: Network Design76 Questions
Exam 7: Wired and Wireless Local Area Networks139 Questions
Exam 8: Backbone Networks71 Questions
Exam 9: Wide Area Networks74 Questions
Exam 10: The Internet73 Questions
Exam 11: Network Security127 Questions
Exam 12: Network Management73 Questions
Select questions type
Which of the following is not a current trend that is making the traditional design approach less appropriate for today's networks?
(Multiple Choice)
4.7/5
(93)
Today, many organizations design networks using the building-block approach.
(True/False)
4.9/5
(77)
Which of the following is not included in the key deliverable for the needs assessment stage of the building-block network design process, the set of logical network diagrams?
(Multiple Choice)
4.9/5
(77)
The campus backbone or core layer) is the network architecture component responsible for providing end user access to the network.
(True/False)
4.8/5
(79)
A traditional network design approach follows a structured systems analysis and design process similar to that used in building applications.
(True/False)
4.8/5
(84)
Which of the following is not a main item for which network designers estimate costs for the proposed network?
(Multiple Choice)
4.8/5
(72)
The goals in the needs analysis step of network design are exactly the same when designing LANs vs.when designing WANs.
(True/False)
4.9/5
(90)
Which of the following is not directly contributing to the dramatic increase in network traffic today?
(Multiple Choice)
5.0/5
(83)
Which of the following is a way to sell the network proposal to management?
(Multiple Choice)
4.9/5
(86)
The goal of the needs analysis step is to produce a ___________, or a statement of the network elements necessary to meet the needs of the organization.
(Multiple Choice)
4.9/5
(82)
To establish circuit loading, the designer usually starts with the:
(Multiple Choice)
4.9/5
(64)
Today, all network traffic is due to traffic from internal application systems.
(True/False)
4.8/5
(80)
Networks requirements can be divided into mandatory, desirable, and wish-list requirements.
(True/False)
4.8/5
(84)
To estimate costs for large network purchases, organizations often:
(Multiple Choice)
4.8/5
(81)
Which of the following would not be a type of circuit that needs to be considered when planning for technology design capacity?
(Multiple Choice)
4.7/5
(77)
Cost assessment is used to look at the relative cost of technologies used in a network design.
(True/False)
4.8/5
(90)
The traditional network design approach does not work well for _________ networks.
(Multiple Choice)
4.9/5
(76)
Showing 41 - 60 of 76
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)