Exam 12: Activity Analysis: Costing and Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: standard Hours or Quantity standard price or Rate Direct materials 3.0 pounds £0.75 per pound Direct labour 0.4 hours £12.00 per hour Variable manufacturing overhead 0.4 hours £9.00 per hour During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of direct labour hours. The following events occurred during March: 8,600 pounds of sand were purchased at a cost of £7,310. 7,200 pounds of sand were used for core tests. 840 actual direct labour hours were worked at a cost of £8,610. Actual variable manufacturing overhead incurred was £3,200. - The labour efficiency variance for March is

(Multiple Choice)
4.8/5
(90)

The following labour standards have been established for a particular product: Standard labour hours per unit of output 8.10 hours Standard labour rate £14.40 per hour The following data pertain to operations concerning the product for the last month:Actual hours worked 8,700\quad 8,700 hours Actual total labour cost £129,195£ 129,195 Actual output \quad \quad \quad 1,000 units - What is the labour efficiency variance for the month

(Multiple Choice)
4.7/5
(74)

The entry to record unfavorable labour efficiency variance and a favourable labour rate variance is

(Multiple Choice)
4.9/5
(83)
Showing 61 - 63 of 63
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)