Exam 13: Budgeting and Standard Cost Systems
Exam 1: The Role of Accounting in Business96 Questions
Exam 2: Basic Accounting Concepts89 Questions
Exam 3: Accrual Accounting Concepts111 Questions
Exam 4: Accounting for Merchandising Businesses138 Questions
Exam 5: Sarbanes-Oxley, Internal Control, and Cash110 Questions
Exam 6: Receivables and Inventories102 Questions
Exam 7: Fixed Assets and Intangible Assets86 Questions
Exam 8: Liabilities and Stockholders Equity131 Questions
Exam 9: Financial Statement Analysis83 Questions
Exam 10: Accounting Systems for Manufacturing Businesses120 Questions
Exam 11: Cost Behavior and Cost-Volume-Profit Analysis140 Questions
Exam 12: Differential Analysis and Product Pricing99 Questions
Exam 13: Budgeting and Standard Cost Systems168 Questions
Exam 14: Performance Evaluation for Decentralized Operations137 Questions
Exam 15: Capital Investment Analysis103 Questions
Select questions type
The difference between the standard cost of a product and its actual cost is called a variance.
(True/False)
4.8/5
(82)
The standard fixed factory overhead rate is based on 100% capacity of 120,000 machine hours for Thompson Inc. The standard costs and the actual costs of factory overhead for the production of 25,000 units during March were as follows: \ 950,000 Actual: Factory overhead 900,000 Standard: 100,000 hours at \ 9.00
If there was a $60,000 unfavorable volume variance for March, what is the standard fixed factory overhead cost rate?
(Multiple Choice)
4.7/5
(87)
If the expected sales volume for the current period is 22,000 units, the desired ending inventory is 800 units, and the beginning inventory is 500 units, the number of units set forth in the production budget, representing total production for the current period, is:
(Multiple Choice)
4.9/5
(75)
Standard Corporation uses a standard cost system. The following information was provided for the period that just ended: 3 hrs. Stanchard time per completed unit \ 108,000 Actual total factory overhe ad \ 60,000 Fixed factory overhead \ 2.00 per labor hour Standard fixed factory overhead rate 30,000 hours Standard variable factory overhe ad rate 28,000 hours Normal capacity 9,000 Plant operated during the period
The fixed factory overhead volume variance is
(Multiple Choice)
4.8/5
(71)
It would be most appropriate to develop direct labor time standards for use in administrative activities when the activity involves:
(Multiple Choice)
4.9/5
(75)
The following data relate to direct labor costs for the current period: 36,000 hours at \2 3.50 Standard costs 36,000 hours at \ 23.00 Actual costs
What is the direct labor time variance?
(Multiple Choice)
4.8/5
(84)
An unfavorable volume variance may be due to a failure of supervisors to maintain an even flow of work.
(True/False)
4.7/5
(82)
If the standard to produce a given amount of product is 1,000 units of direct materials at $11 and the actual was 800 units at $12, the direct materials price variance was $800 favorable.
(True/False)
4.9/5
(82)
The most effective means of presenting standard factory overhead cost variance data is through a selling overhead cost budget.
(True/False)
4.9/5
(81)
The following data is given for the Walker Company: 1, 000 units Budgeted prochuction 980 units Actual production Materiale: \ 2.00 Standard price per 1b 12 Standard pounds per completed urit 11,800 Actual pounds purchased and used in production \ 23,000 Actual price paid for materials Labor: \ 14 per hour Standard hourly labor rate 4.5 Standard hours allowed per completed unit 4,560 Actual labor hours worked \ 62.928 Actual total labor costs Overhead: \ 27,000 Actual and budgeted fixed overhead \ 3.50 per standard labor hour Standard variable overhead rate \ 15.500 Actual variable overhead costs Overhead is applied on standard labor hours.
The factory overhead volume variance is:
(Multiple Choice)
4.8/5
(79)
Which of the following will not affect direct materials quantity variance?
(Multiple Choice)
4.8/5
(84)
If Division Inc. expects to sell 300,000 units in 2012, desires ending inventory of 22,000 units, and has 24,000 units on hand as of the beginning of the year, the budgeted volume of production for 2012 is 298,000 units.
(True/False)
4.9/5
(71)
The difference between the budgeted fixed overhead at 100% of normal capacity and the standard fixed cost for the actual units produced is termed volume variance.
(True/False)
4.8/5
(83)
Which of the following are the principal components of a master budget?
(Multiple Choice)
4.9/5
(80)
The master budget of a small manufacturer would normally include all necessary component budgets except the capital expenditures budget.
(True/False)
4.8/5
(72)
Production and sales estimates for May for the Hudson Co. are as follows: 17,500 Estimated inventory (units), May 1 19,300 Desired inventory (unit), May 31 Expected sales volume (units): 4,200 Area W 7,000 AreaX 9,000 Area Y \ 15 Unit sales price The number of units expected to be sold in May is:
(Multiple Choice)
4.8/5
(86)
Christiansen and Sons' static budget for 10,000 units of production includes $50,000 for direct materials, $44,000 for direct labor, utilities of $5,000, and supervisor salaries of $15,000. A flexible budget for 12,000 units of production would show:
(Multiple Choice)
4.9/5
(65)
If the wage rate paid per hour differs from the standard wage rate per hour for direct labor, the variance is termed:
(Multiple Choice)
4.8/5
(92)
The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead) based on 100% capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows: \ 360,000 Variable factory overhe ad Actual 104,000 Fixed factory overhead 450,000 60,000 hours at \ 7.50 Standard:
What is the amount of the fixed factory overhead volume variance?
(Multiple Choice)
4.8/5
(72)
The budget that summarizes future plans for the acquisition of fixed assets is the:
(Multiple Choice)
4.8/5
(88)
Showing 21 - 40 of 168
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)