Exam 10: Standard Costing and Variance Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The difference between the actual cost of the input and its planned cost is

(Multiple Choice)
4.9/5
(80)

The ____________________ measures the difference between what should have been paid for raw materials and what was actually paid.

(Short Answer)
4.7/5
(74)

Which of the following relationships is valid concerning fixed overhead budgeted at the beginning of the year?

(Multiple Choice)
4.9/5
(76)

Match the variance with its correct calculation. -Budgeted Costs

(Multiple Choice)
4.9/5
(60)

Match the variance with its correct calculation. -Materials Usage Variance

(Multiple Choice)
5.0/5
(73)

The quantity of each input that should be used to produce one unit of output is documented on the standard cost sheet.

(True/False)
4.8/5
(82)

Which of the following is true regarding the disposition of materials and labor variances?

(Multiple Choice)
4.7/5
(75)

During April, a small roofing company purchased 500 bundles of a certain type of shingle at a price of $20 per bundle, $5 more than the standard price.The standard quantity of this type of shingle is 550 bundles. What is the journal entry to record the issuance and usage of materials assuming that the roofing company purchased and used 500 bundles?

(Multiple Choice)
4.9/5
(79)

During June, Zinc Company produced 10,000 chainsaw blades.The standard quantity of material allowed per unit was 2 pounds of steel per blade at a standard cost of $5 per pound.Zinc determined that it had a favorable materials usage variance of $1,500 for June.Calculate the actual quantity of materials used by Zinc Company in June.

(Multiple Choice)
4.8/5
(68)

Which of the following sources of quantitative standards should be used with caution because it can perpetuate inefficiencies?

(Multiple Choice)
4.9/5
(67)

Managers develop quantity standards when they decide what amount of input should be used per unit of output.

(True/False)
4.8/5
(65)

Which of the following formulas calculates the total fixed overhead (FOH) variance?

(Multiple Choice)
4.7/5
(86)

Currently attainable standards offer the most behavioral benefits because higher performance levels are attained through challenging, yet achievable, standards.

(True/False)
4.8/5
(85)

Tetrene Fliers Company produces model airplanes.During the month of November, it produced 2,500 planes.The actual labor hours were 9 hours per plane.Its standard labor hours are 12 hours per plane.The standard labor rate is $8 per hour.At the end of November, Tetrene Fliers found that it had a favorable labor rate variance of $9,000. ​ What was Tetrene Fliers' total labor variance?

(Multiple Choice)
4.9/5
(74)

Fixed overhead was budgeted at $84,000 and 10,000 direct labor hours were budgeted.If the fixed overhead volume variance was $3,200 unfavorable and the fixed overhead spending variance was $1,200 favorable, fixed overhead applied must be

(Multiple Choice)
4.9/5
(86)

The total budget variance is the difference between the actual cost of the input and its planned cost.

(True/False)
4.8/5
(74)

All of the following are true regarding variance investigation except

(Multiple Choice)
4.8/5
(93)

Kris Company calculates its predetermined rates using practical volume, which is 325,000 units.The standard cost system allows 3 direct labor hours per unit produced.Overhead is applied using direct labor hours.The total budgeted overhead is $4,260,000, of which $994,000 is fixed overhead.The actual results for the year are as follows: Kris Company calculates its predetermined rates using practical volume, which is 325,000 units.The standard cost system allows 3 direct labor hours per unit produced.Overhead is applied using direct labor hours.The total budgeted overhead is $4,260,000, of which $994,000 is fixed overhead.The actual results for the year are as follows:     -  Calculate the fixed overhead spending variance. - Calculate the fixed overhead spending variance.

(Multiple Choice)
4.8/5
(79)

James Company manufactures t-shirts.During the year, it manufactured 250,000 t-shirts, using 2 hours of direct labor at a rate of $8.50 per hour.The materials and labor standards for manufacturing the t-shirts are: James Company manufactures t-shirts.During the year, it manufactured 250,000 t-shirts, using 2 hours of direct labor at a rate of $8.50 per hour.The materials and labor standards for manufacturing the t-shirts are:      -  It took James 1,400,000 yards at $2.50 per yard to make the 250,000 t-shirts. What is the entry to record the purchase of materials? - It took James 1,400,000 yards at $2.50 per yard to make the 250,000 t-shirts. What is the entry to record the purchase of materials?

(Multiple Choice)
4.7/5
(76)

Anemone Company manufactures model airplanes.During the month, it manufactured 20,000 airplanes.Each one used an average of 8 direct labor hours and an average of 2 sheets of aluminum.It normally manufactures 8,000 airplanes.Materials and labor standards for making the airplanes are as follows: Anemone Company manufactures model airplanes.During the month, it manufactured 20,000 airplanes.Each one used an average of 8 direct labor hours and an average of 2 sheets of aluminum.It normally manufactures 8,000 airplanes.Materials and labor standards for making the airplanes are as follows:    Compute the standard hours allowed for a volume of 20,000 airplanes. Compute the standard hours allowed for a volume of 20,000 airplanes.

(Multiple Choice)
4.9/5
(79)
Showing 161 - 180 of 216
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)