Exam 10: Standard Costing and Variance Analysis
Exam 1: Introduction to Managerial Accounting57 Questions
Exam 2: Basic Managerial Accounting Concepts216 Questions
Exam 3: Cost Behavior, Cost Forecasting, and Segmented Income Statements261 Questions
Exam 4: Job-Order Costing and Normal Cost Overhead Application175 Questions
Exam 5: Activity-Based Costing and Management123 Questions
Exam 6: Process Costing150 Questions
Exam 7: Cost-Volume-Profit Analysis154 Questions
Exam 8: Tactical Decision-Making and Relevant Costing164 Questions
Exam 9: Profit Planning and Flexible Budgets194 Questions
Exam 10: Standard Costing and Variance Analysis216 Questions
Exam 11: Performance Evaluation and Decentralization140 Questions
Exam 12: Capital Investment Decisions149 Questions
Exam 13: Emerging Topics in Managerial Accounting: Sustainability, Quality Cost, Lean Accounting, International Issues, Enterprise Risk Management, the Managerial Accountant in Forensicfraud Accounting128 Questions
Exam 14: Statement of Cash Flows153 Questions
Exam 15: Financial Statement Analysis163 Questions
Select questions type
Engineering studies are often too rigorous and may not be achievable by operating personnel.
(True/False)
4.9/5
(82)
The ____________________ is the difference between the actual cost of the input and its planned cost.
(Short Answer)
4.8/5
(82)
An accountant would refer to a cost sheet to perform which of the following actions?
(Multiple Choice)
4.8/5
(87)
Kris Company calculates its predetermined rates using practical volume, which is 325,000 units.The standard cost system allows 3 direct labor hours per unit produced.Overhead is applied using direct labor hours.The total budgeted overhead is $4,260,000, of which $994,000 is fixed overhead.The actual results for the year are as follows:
-
Calculate the fixed overhead volume variance.
(Multiple Choice)
4.7/5
(79)
During January, 7,000 direct labor hours were worked at a standard cost of $20 per hour.If the direct labor rate variance for January was $17,500 favorable, the actual cost per direct labor hour must be
(Multiple Choice)
5.0/5
(88)
The actual quantity of input at the standard price less than the standard quantity of input at the standard price equals the usage variance.
(True/False)
4.8/5
(87)
Kris Company calculates its predetermined rates using practical volume, which is 325,000 units.The standard cost system allows 3 direct labor hours per unit produced.Overhead is applied using direct labor hours.The total budgeted overhead is $4,260,000, of which $994,000 is fixed overhead.The actual results for the year are as follows:
- The predetermined variable overhead rate is
(Multiple Choice)
4.9/5
(87)
Kaizen costing provides fixed standards which reflect continuous improvement efforts.
(True/False)
4.7/5
(83)
Price changes of variable overhead items are easily controlled by production supervisors.
(True/False)
4.9/5
(85)
During September, a small roofing company purchased 200 bundles of a certain type of shingle at a price of $25 per bundle, $5 less than the standard price.Its standard quantity of this type of shingle is 400 bundles.What is the journal entry to record the purchase of materials?
(Multiple Choice)
4.9/5
(84)
Which of the following expressions is used to calculate the labor efficiency variance?
(Multiple Choice)
4.8/5
(61)
James Company manufactures t-shirts.During the year, it manufactured 250,000 t-shirts, using 2 hours of direct labor at a rate of $8.50 per hour.The materials and labor standards for manufacturing the t-shirts are:
- It took James 1,400,000 yards at $2.50 per yard to make the 250,000 t-shirts.
What is the entry to close the variances of labor and materials?
(Multiple Choice)
5.0/5
(76)
Which of the following is not an advantage of standard costing over normal costing and actual costing?
(Multiple Choice)
4.8/5
(91)
Which of the following is the difference between the actual cost of materials and the materials cost allowed for the actual level of activity?
(Multiple Choice)
4.9/5
(80)
The _____________________ measures the aggregate effect of differences between the actual variable overhead rate and the standard variable overhead rate.
(Short Answer)
4.9/5
(76)
James Company manufactures t-shirts.During the year, it manufactured 250,000 t-shirts, using 2 hours of direct labor at a rate of $8.50 per hour.The materials and labor standards for manufacturing the t-shirts are:
- It took James 1,400,000 yards at $2.50 per yard to make the 250,000 t-shirts.
What is James' materials usage variance?
(Multiple Choice)
4.9/5
(88)
Anemone Company produces picture frames.During the year, 200,000 picture frames were produced.Materials and labor standards for producing the picture frames are as follows:
Anemone purchased and used 600,000 pieces of wood at $4.00 each, and its actual labor hours were 320,000 hours at a wage rate of $13.
What is Anemone's labor rate variance?
(Multiple Choice)
4.7/5
(80)
During April, a small roofing company purchased 400 bundles of a certain type of shingle at a price of $40 per bundle, $5 more than the standard price.The standard quantity of this type of shingle is 440 bundles. ?
What is the journal entry to record the purchase of materials?
(Multiple Choice)