Exam 10: Standard Costing and Variance Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Engineering studies are often too rigorous and may not be achievable by operating personnel.

(True/False)
4.9/5
(82)

The ____________________ is the difference between the actual cost of the input and its planned cost.

(Short Answer)
4.8/5
(82)

An accountant would refer to a cost sheet to perform which of the following actions?

(Multiple Choice)
4.8/5
(87)

Kris Company calculates its predetermined rates using practical volume, which is 325,000 units.The standard cost system allows 3 direct labor hours per unit produced.Overhead is applied using direct labor hours.The total budgeted overhead is $4,260,000, of which $994,000 is fixed overhead.The actual results for the year are as follows: Kris Company calculates its predetermined rates using practical volume, which is 325,000 units.The standard cost system allows 3 direct labor hours per unit produced.Overhead is applied using direct labor hours.The total budgeted overhead is $4,260,000, of which $994,000 is fixed overhead.The actual results for the year are as follows:     -  Calculate the fixed overhead volume variance. - Calculate the fixed overhead volume variance.

(Multiple Choice)
4.7/5
(79)

The sources of quantitative standards include

(Multiple Choice)
4.8/5
(78)

During January, 7,000 direct labor hours were worked at a standard cost of $20 per hour.If the direct labor rate variance for January was $17,500 favorable, the actual cost per direct labor hour must be

(Multiple Choice)
5.0/5
(88)

The actual quantity of input at the standard price less than the standard quantity of input at the standard price equals the usage variance.

(True/False)
4.8/5
(87)

Kris Company calculates its predetermined rates using practical volume, which is 325,000 units.The standard cost system allows 3 direct labor hours per unit produced.Overhead is applied using direct labor hours.The total budgeted overhead is $4,260,000, of which $994,000 is fixed overhead.The actual results for the year are as follows: Kris Company calculates its predetermined rates using practical volume, which is 325,000 units.The standard cost system allows 3 direct labor hours per unit produced.Overhead is applied using direct labor hours.The total budgeted overhead is $4,260,000, of which $994,000 is fixed overhead.The actual results for the year are as follows:     - The predetermined variable overhead rate is - The predetermined variable overhead rate is

(Multiple Choice)
4.9/5
(87)

Kaizen costing provides fixed standards which reflect continuous improvement efforts.

(True/False)
4.7/5
(83)

Price changes of variable overhead items are easily controlled by production supervisors.

(True/False)
4.9/5
(85)

During September, a small roofing company purchased 200 bundles of a certain type of shingle at a price of $25 per bundle, $5 less than the standard price.Its standard quantity of this type of shingle is 400 bundles.What is the journal entry to record the purchase of materials?

(Multiple Choice)
4.9/5
(84)

Which of the following expressions is used to calculate the labor efficiency variance?

(Multiple Choice)
4.8/5
(61)

Price standards are based on

(Multiple Choice)
4.8/5
(86)

James Company manufactures t-shirts.During the year, it manufactured 250,000 t-shirts, using 2 hours of direct labor at a rate of $8.50 per hour.The materials and labor standards for manufacturing the t-shirts are: James Company manufactures t-shirts.During the year, it manufactured 250,000 t-shirts, using 2 hours of direct labor at a rate of $8.50 per hour.The materials and labor standards for manufacturing the t-shirts are:     - It took James 1,400,000 yards at $2.50 per yard to make the 250,000 t-shirts. What is the entry to close the variances of labor and materials? - It took James 1,400,000 yards at $2.50 per yard to make the 250,000 t-shirts. What is the entry to close the variances of labor and materials?

(Multiple Choice)
5.0/5
(76)

Which of the following is not an advantage of standard costing over normal costing and actual costing?

(Multiple Choice)
4.8/5
(91)

Which of the following is the difference between the actual cost of materials and the materials cost allowed for the actual level of activity?

(Multiple Choice)
4.9/5
(80)

The _____________________ measures the aggregate effect of differences between the actual variable overhead rate and the standard variable overhead rate.

(Short Answer)
4.9/5
(76)

James Company manufactures t-shirts.During the year, it manufactured 250,000 t-shirts, using 2 hours of direct labor at a rate of $8.50 per hour.The materials and labor standards for manufacturing the t-shirts are: James Company manufactures t-shirts.During the year, it manufactured 250,000 t-shirts, using 2 hours of direct labor at a rate of $8.50 per hour.The materials and labor standards for manufacturing the t-shirts are:        -  It took James 1,400,000 yards at $2.50 per yard to make the 250,000 t-shirts. What is James' materials usage variance? - It took James 1,400,000 yards at $2.50 per yard to make the 250,000 t-shirts. What is James' materials usage variance?

(Multiple Choice)
4.9/5
(88)

Anemone Company produces picture frames.During the year, 200,000 picture frames were produced.Materials and labor standards for producing the picture frames are as follows: ​ ​ Anemone Company produces picture frames.During the year, 200,000 picture frames were produced.Materials and labor standards for producing the picture frames are as follows: ​ ​   Anemone purchased and used 600,000 pieces of wood at $4.00 each, and its actual labor hours were 320,000 hours at a wage rate of $13. ​ What is Anemone's labor rate variance? Anemone purchased and used 600,000 pieces of wood at $4.00 each, and its actual labor hours were 320,000 hours at a wage rate of $13. ​ What is Anemone's labor rate variance?

(Multiple Choice)
4.7/5
(80)

During April, a small roofing company purchased 400 bundles of a certain type of shingle at a price of $40 per bundle, $5 more than the standard price.The standard quantity of this type of shingle is 440 bundles. ? What is the journal entry to record the purchase of materials?

(Multiple Choice)
4.8/5
(84)
Showing 81 - 100 of 216
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)