Exam 12: MRP and ERP

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the:

(Multiple Choice)
4.8/5
(71)

If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed?

(Multiple Choice)
5.0/5
(86)

Which is true of a net-change system?

(Multiple Choice)
4.9/5
(75)

As long as a forecast is plus or minus 10%, MRP works well.

(True/False)
4.9/5
(75)

The MRP input storing information on the status of each item by time period (e.g., scheduled receipts, lead time, lot size) is the:

(Multiple Choice)
4.7/5
(87)

The _________ of ERP makes it valuable as a strategic planning tool.

(Multiple Choice)
4.9/5
(81)

The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level continuing on down to the lowest levels shown on the bill of material.

(True/False)
5.0/5
(89)

A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called a(n):

(Multiple Choice)
4.8/5
(81)

Develop a material requirements plan for end item P and its components, given the tree below.Assume that all lead times are one week, and that lot-for-lot ordering is used except for item F, which is ordered in multiples of 400 units. One hundred units of P should be available at the start of week 4 and at the start of week 8.Beginning inventories are: 20 P, 100 A, and 200F. Scheduled receipts are: 800 F at the start of week 1. Develop a material requirements plan for end item P and its components, given the tree below.Assume that all lead times are one week, and that lot-for-lot ordering is used except for item F, which is ordered in multiples of 400 units. One hundred units of P should be available at the start of week 4 and at the start of week 8.Beginning inventories are: 20 P, 100 A, and 200F. Scheduled receipts are: 800 F at the start of week 1.     Develop a material requirements plan for end item P and its components, given the tree below.Assume that all lead times are one week, and that lot-for-lot ordering is used except for item F, which is ordered in multiples of 400 units. One hundred units of P should be available at the start of week 4 and at the start of week 8.Beginning inventories are: 20 P, 100 A, and 200F. Scheduled receipts are: 800 F at the start of week 1.

(Essay)
4.9/5
(82)