Exam 12: MRP and ERP
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
The bill of materials indicates how much material will be needed to produce the quantities on a given master production schedule.
(True/False)
4.8/5
(81)
Safety time is sometimes used in MRP rather than safety stock quantities.
(True/False)
4.8/5
(82)
ERP represents an expanded effort to integrate standardized record-keeping that shares information among different areas of an organization.
(True/False)
4.9/5
(86)
One reason that accurate bills of material are important is that errors at one level become magnified at lower levels because of the multiplication process used by MRP.
(True/False)
4.9/5
(68)
Before a schedule receipt can take place, and order must be placed with a vendor.
(True/False)
4.7/5
(79)
Using the product tree shown, determine the following:
(A) the quantity of component K that will be needed to assemble 80 units of P, assuming no on-hand inventory of any components exists.
(B) the quantity of component K needed to assemble 80 units of P, given on-hand inventory of 30 A's, 50 B's and 20 C's.
(Essay)
4.7/5
(78)
MRP II is simply an improved version of MRP that processes faster and can plan for a larger number of end items.
(True/False)
4.8/5
(82)
One of the primary output reports of MRP concerns changes to planned orders.
(True/False)
4.9/5
(66)
The master production schedule states which end items are to be produced, in addition to when and how many.
(True/False)
4.8/5
(81)
A computer-based information system designed to handle ordering and scheduling of dependent-demand inventories is:
(Multiple Choice)
4.8/5
(92)
If the firm is using a fixed period lot size of two periods, what is the order size for the first order?
(Multiple Choice)
4.8/5
(72)
Which of the following lot sizing methods does not attempt to balance ordering (or setup) and holding costs?
(Multiple Choice)
4.9/5
(83)
An assembly-time chart indicates gross and net requirements taking into account the current available inventory.
(True/False)
4.9/5
(79)
Periodic updating of an MRP system to account for all changes which have occurred within a given time interval is called:
(Multiple Choice)
5.0/5
(88)
Which one of the following is not an input in an MRP system?
(Multiple Choice)
5.0/5
(86)
A bill of materials contains a listing of all the assemblies, parts, and materials needed to produce one unit of an end item.
(True/False)
4.8/5