MRP is used within most MRP II and ERP systems.

(True/False)
4.9/5
(97)

The bill of materials indicates how much material will be needed to produce the quantities on a given master production schedule.

(True/False)
4.8/5
(81)

Safety time is sometimes used in MRP rather than safety stock quantities.

(True/False)
4.8/5
(82)

Which statement concerning MRP II is false?

(Multiple Choice)
4.9/5
(67)

ERP represents an expanded effort to integrate standardized record-keeping that shares information among different areas of an organization.

(True/False)
4.9/5
(86)

One reason that accurate bills of material are important is that errors at one level become magnified at lower levels because of the multiplication process used by MRP.

(True/False)
4.9/5
(68)

Before a schedule receipt can take place, and order must be placed with a vendor.

(True/False)
4.7/5
(79)

Using the product tree shown, determine the following: (A) the quantity of component K that will be needed to assemble 80 units of P, assuming no on-hand inventory of any components exists. (B) the quantity of component K needed to assemble 80 units of P, given on-hand inventory of 30 A's, 50 B's and 20 C's.

(Essay)
4.7/5
(78)

MRP II is simply an improved version of MRP that processes faster and can plan for a larger number of end items.

(True/False)
4.8/5
(82)

One of the primary output reports of MRP concerns changes to planned orders.

(True/False)
4.9/5
(66)

The master production schedule states which end items are to be produced, in addition to when and how many.

(True/False)
4.8/5
(81)

A computer-based information system designed to handle ordering and scheduling of dependent-demand inventories is:

(Multiple Choice)
4.8/5
(92)

If the firm is using a fixed period lot size of two periods, what is the order size for the first order?

(Multiple Choice)
4.8/5
(72)

Low level coding represents items less than $18 per unit.

(True/False)
4.9/5
(91)

Which of the following lot sizing methods does not attempt to balance ordering (or setup) and holding costs?

(Multiple Choice)
4.9/5
(83)

An assembly-time chart indicates gross and net requirements taking into account the current available inventory.

(True/False)
4.9/5
(79)

Periodic updating of an MRP system to account for all changes which have occurred within a given time interval is called:

(Multiple Choice)
5.0/5
(88)

Which one of the following is not an input in an MRP system?

(Multiple Choice)
5.0/5
(86)

Net requirements equal gross requirements minus safety stock.

(True/False)
5.0/5
(92)

A bill of materials contains a listing of all the assemblies, parts, and materials needed to produce one unit of an end item.

(True/False)
4.8/5
(70)