Exam 3: Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Analysts should have little interest in improving worker satisfaction with the system.

(True/False)
4.9/5
(81)

One way to think about problems is to:

(Multiple Choice)
4.8/5
(76)

The main advantage of the PERT diagram is its simplicity.

(True/False)
4.9/5
(88)

Along with managing time and resources, systems analysts must also manage people.

(True/False)
4.8/5
(77)

Setting goals can motivate team members by clarifying for them and others what must be done in order to get results.

(True/False)
4.8/5
(81)

The longest path through a PERT diagram is referred to as the ________ path.

(Multiple Choice)
4.9/5
(79)

Using a weighted average formula to determine expected activity times is probably the best strategy for estimating those times.

(True/False)
4.7/5
(86)

Systems analysts formulate numbers that represent both current and projected ________ for the system so that any hardware obtained will possess the capability to handle current and future needs.

(Multiple Choice)
4.8/5
(72)

Which of the following is not a way in which systems projects are considered to be feasible?

(Multiple Choice)
4.9/5
(88)

Which of these statements about PERT diagrams is not true?

(Multiple Choice)
4.9/5
(76)

________ feasibility refers to projecting whether the system will operate and be used once it is installed.

(Multiple Choice)
4.8/5
(72)

Cloud services are not very scalable. Once you pay for the service, it is hard to upgrade in the future.

(True/False)
4.9/5
(77)

The longest path through a PERT diagram is called:

(Multiple Choice)
4.7/5
(68)

Which of the following is a reason given by programmers for failed projects?

(Multiple Choice)
4.8/5
(80)

List four criteria for evaluating computer hardware for purchase.

(Essay)
4.8/5
(80)

Improvements to systems include all the following except:

(Multiple Choice)
5.0/5
(87)

By comparing costs alone, the systems analyst can use break-even analysis to determine the break-even capacity of the proposed information system.

(True/False)
4.8/5
(77)

A functional norm is one that could make team members waste resources.

(True/False)
4.9/5
(71)

Which of the following is not an advantage of using a PERT diagram over a Gantt chart?

(Multiple Choice)
4.8/5
(83)

The length of the arrows in a PERT diagram has a direct relationship with the duration of the activity.

(True/False)
4.7/5
(84)
Showing 41 - 60 of 79