Exam 22: Scheduling

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

To facilitate utilization of bottleneck operations, in theory of constraints scheduling ________ can be split into __________ to reduce waiting times.

(Multiple Choice)
4.9/5
(71)

A Gantt chart is a basic scheduling tool that is most useful in low-volume systems.

(True/False)
4.9/5
(78)

Scheduling in service systems often takes the form of: (I) appointment systems. (II) reservation systems. (III) makespan systems.

(Multiple Choice)
4.8/5
(93)

Job X, which has a duration of four days, is due by the close of business on Friday, December 23. Without looking at the work already scheduled on X's required resource, the scheduler schedules X to be begun on the morning of Tuesday, December 20. This is an example of:

(Multiple Choice)
4.9/5
(83)

The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: Job Processing Time (hrs) Due (hrs from now) W 4 4 3 5 2 2 1 1 If he uses the shortest processing time first priority rule to schedule these jobs, what will be the average number of jobs in his shop today?

(Multiple Choice)
4.8/5
(68)

Which of the following is the last step in the capacity/scheduling chain?

(Multiple Choice)
4.8/5
(79)

Scheduling in service systems may involve scheduling: (I) the workforce. (II) the equipment. (III) customers.

(Multiple Choice)
4.8/5
(83)

The owner/operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: Job Processing Time (hrs) Due (hrs from now) W 4 4 X 3 5 Y 2 2 Z 1 1 If he uses the earliest due date first priority rule to schedule these jobs, what will be the average job tardiness?

(Multiple Choice)
4.9/5
(84)

Splitting a large lot after one operation beyond a bottleneck operation would reduce the overall waiting time of the bottleneck operation.

(True/False)
4.8/5
(79)

The output of the system cannot exceed the output of the bottleneck operation(s).

(True/False)
4.9/5
(83)

Bottlenecks in service systems may shift with the passage of time, so that different operations become bottleneck operations at different times.

(True/False)
4.9/5
(76)

In the decision-making hierarchy, scheduling decisions are the final step in the transformation process before actual output occurs.

(True/False)
4.9/5
(68)

The priority rule which will sequence jobs in the order they are received is:

(Multiple Choice)
5.0/5
(79)

For the jobs listed below, which processing sequence would result using Johnson's rule? For the jobs listed below, which processing sequence would result using Johnson's rule?

(Multiple Choice)
4.9/5
(86)

Scheduled due dates are the result of:

(Multiple Choice)
4.9/5
(84)

Eva, the owner of Eva's Second Time Around Wedding Dresses, currently has five dresses to be altered, shown in the order in which they arrived: Eva, the owner of Eva's Second Time Around Wedding Dresses, currently has five dresses to be altered, shown in the order in which they arrived:   If Eva uses the earliest due date first (EDD) priority rule to schedule these jobs, what will be the average job tardiness? If Eva uses the earliest due date first (EDD) priority rule to schedule these jobs, what will be the average job tardiness?

(Multiple Choice)
5.0/5
(81)

There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows: Job (Hours) Resource A B C D 1 5 8 7 7 2 4 9 5 9 3 6 9 8 7 4 7 6 6 9 For the optimal schedule, what is the total number of hours required to complete these jobs?

(Multiple Choice)
4.9/5
(84)

The two different approaches to load work centers in job-shop scheduling are:

(Multiple Choice)
4.8/5
(66)

The elimination of idle time on both bottleneck and non-bottleneck operations must be accomplished to optimize output.

(True/False)
4.7/5
(81)

Sequencing is concerned with the order in which jobs are done, while loading is concerned with assigning jobs to work centers or workstations.

(True/False)
4.8/5
(83)