Exam 14: Quality Control
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness70 Questions
Exam 3: Forecasting139 Questions
Exam 4: Product and Service Design78 Questions
Exam 4: RELIABILITY – Static12 Questions
Exam 6: Strategic Capacity Planning for Products and Services85 Questions
Exam 7: Decision Theory– Static114 Questions
Exam 8: Process Selection and Facility Layout132 Questions
Exam 9: Work Design and Measurement129 Questions
Exam 10: learning curve– Static61 Questions
Exam 11: Location Planning and Analysis62 Questions
Exam 12: The Transportation Model– Static20 Questions
Exam 13: Management of Quality97 Questions
Exam 14: Quality Control112 Questions
Exam 15: Acceptance Sampling– Static51 Questions
Exam 16: Aggregate Planning and Master Scheduling74 Questions
Exam 17: MRP and ERP81 Questions
Exam 18: Inventory Management128 Questions
Exam 19: JIT and Lean Operations79 Questions
Exam 20: Maintenance– Static36 Questions
Exam 21: Supply Chain Management87 Questions
Exam 22: Scheduling98 Questions
Exam 23: Project Management113 Questions
Exam 24: Management of Waiting Lines64 Questions
Exam 25: Linear Programming93 Questions
Select questions type
A p-chart is used to monitor the fraction of defectives in the output of a process.
(True/False)
4.8/5
(75)
When a process is in control, it results in there being, on average, 16 defects per unit of output. chart limits of 4 and 28 would lead to a _______ percent chance of a Type I error.
(Multiple Choice)
4.8/5
(78)
Organizations should work to improve process capability so that inspection efforts can become more:
(Multiple Choice)
4.9/5
(87)
Which of the following is not a step in the control process?
(Multiple Choice)
4.8/5
(65)
A control chart used to monitor the number of defects per unit is the:
(Multiple Choice)
4.9/5
(79)
A time-ordered plot of representative sample statistics is called a(n):
(Multiple Choice)
4.8/5
(89)
A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is in control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each: Day Weight (ounces) Monday 23 22 23 24 Tuesday 23 21 19 21 Wednesday 20 19 20 21 Thursday 18 19 20 19 Friday 18 20 22 20
What is the sample mean package weight for Thursday?
(Multiple Choice)
4.9/5
(82)
Consider the following information: Observations 1 2 3 4 5 6 Num. of defects 10 18 13 15 9 12
The number of runs above and below the sample median is:
(Multiple Choice)
4.9/5
(65)
A quality analyst wants to construct a control chart for determining whether four machines, all producing the same product, are in control with regard to a particular quality attribute. Accordingly, she inspected 1,000 units of output from each machine in random samples, with the following results: Machine Total Defectives \#1 23 \#2 15 \#3 29 \#4 13
What is the estimate of the process proportion of defectives?
(Multiple Choice)
4.7/5
(78)
A quality analyst wants to construct a control chart for determining whether four machines, all producing the same product, are in control with regard to a particular quality attribute. Accordingly, she inspected 1,000 units of output from each machine in random samples, with the following results: Machine Total Defectives \#1 23 \#2 15 \#3 29 \#4 13
What are the control chart upper and lower control limits for an alpha risk of .05?
(Multiple Choice)
4.9/5
(93)
_______ variation is a variation whose cause can be identified.
(Multiple Choice)
4.8/5
(73)
Showing 101 - 112 of 112
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)