The range chart (R-chart) is most likely to detect a change in:

(Multiple Choice)
4.9/5
(82)

Statistical process control charts are not really used to fix quality so much as they are used to:

(Multiple Choice)
4.9/5
(96)

When a process is in control, it results in there being, on average, 16 defects per unit of output. c-chart limits of 8 and 24 would lead to a _______ percent chance of a Type I error.

(Multiple Choice)
4.9/5
(64)

A c-chart is used to monitor the total number of defectives in the output of a process.

(True/False)
4.7/5
(82)

A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is in control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each: Day Weight (ounces) Monday 23 22 23 24 Tuesday 23 21 19 21 Wednesday 20 19 20 21 Thursday 18 19 20 19 Friday 18 20 22 20 What is the mean of the sampling distribution of sample means when this process is in control?

(Multiple Choice)
4.8/5
(73)

The traditional view is that the optimum level of inspection is where the:

(Multiple Choice)
4.8/5
(82)

The specifications for a product are 6 mm ± 0.1 mm. The process is known to operate at a mean of 6.05 with a standard deviation of 0.01 mm. What is the Cpk for this process?

(Multiple Choice)
4.8/5
(88)

A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 495 500 505 500 2 525 515 505 515 3 470 480 460 470 If he uses upper and lower control limits of 520 and 480 hours, what is his risk (alpha) of concluding that service life is out of control when it is actually under control (Type I error)?

(Multiple Choice)
4.9/5
(78)

The following data occurs chronologically from left to right: 15.2 19.7 16.0 11.1 14.8 14.5 The number of runs above and below the sample median is:

(Multiple Choice)
4.8/5
(91)

The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are in control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Instructor Number of Failures Prof. A 13 Prof. B 0 Prof. C 11 Prof. D 16 What is the sample proportion of failures (p) for Prof. D?

(Multiple Choice)
4.9/5
(80)

The more progressive a firm's approach to quality assurance, the less that company will need to rely on:

(Multiple Choice)
5.0/5
(78)

A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is in control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each: Day Weight (ounces) Monday 23 22 23 24 Tuesday 23 21 19 21 Wednesday 20 19 20 21 Thursday 18 19 20 19 Friday 18 20 22 20 If he uses upper and lower control limits of 22 and 18 ounces, on what day(s), if any, does this process appear to be out of control?

(Multiple Choice)
4.7/5
(70)

The amount of inspection needed is governed by the costs of inspection and the expected costs of passing defective items.

(True/False)
4.9/5
(68)

The greater the volume of the process being targeted for inspection, the more attractive __________ inspection is.

(Multiple Choice)
4.7/5
(82)

An R value of zero (on a range chart) means that the process must be in control since all sample values are equal.

(True/False)
4.9/5
(65)

The number of defective parts in a sample is an example of variable data because it will "vary" from one sample to another.

(True/False)
4.8/5
(75)

The purpose of quality control is making sure that processes are performing in an acceptable manner.

(True/False)
5.0/5
(85)

Attributes need to be measured, whereas variable data can be counted.

(True/False)
4.9/5
(75)

A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 495 500 505 500 2 525 515 505 515 3 470 480 460 470 If he uses upper and lower control limits of 520 and 480 hours, on what sample(s) (if any) does service life appear to be out of control?

(Multiple Choice)
4.9/5
(77)

A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 495 500 505 500 2 525 515 505 515 3 470 480 460 470 What is the sample mean service life for sample 2?

(Multiple Choice)
4.9/5
(79)